Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Norway

Norway, Nordland - no/64

Road

Open invitation to tender, deadline 26th March, 2004 for construction of the 3.6 km-long 8.5 m-wide Umskaret tunnel and 2 km of access roads on road Ev 12 in Helgeland. It is a single bore that will be drilled and blasted. Support with rockbolts and shotcrete with fibres. Mucking-out with dumper trucks. Geology mainly consisting of metamorphic micaschist. Award in April 2004. Work start in May 2004 for completion in October 2006. Construction cost: NOK200 million. Financing by the Norwegian Public Roads Administration. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=014644-2004, OJ S 17, or contact Statens vegvesen, Bodoe, fax +47 75552951. E-mail jan.nyheim@vegvesen.no 07/04.Open call for tenders, deadline 11th January, 2006 for protection works against rockfalls and avalanches in Fjoesdalen, including a 1.6 km tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=207198-2005, OJ S 207, or contact Statens vegvesen Region north, Bodoe, fax +47 75552951. E-mail firmapost-nord@vegvesen.no 45/05.



Permalink

Norway, Akershus - no/63

Motorway

Open call for bids, deadline 6th February, 2004 for construction plans, tender documents, work drawings, etc. for the new E16 from Wí¸yen to Bjí¸rum in Bí¦rum municipality, Akershus county. Length is 5.1 km, whereof 2.5 km in tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=215637-2003, OJ S 242, or contact Statens vegvesen Region east, Oslo, fax +47 23054001. E-mail wencaa@vegvesen.no 02/04.Preinformation notice for construction of the E16 motorway Woyen-Bjorum (3,740 m), section Woyen-Isi, including two 2-lane tunnels. The 2 x 1,100 m Brenne tunnel includes 940 m of rock tunnel and 160 m of false tunnel. The 2 x 1,440 m Berghoff tunnel includes 1,310 m of rock tunnel and 130 m of false tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=122986-2005, OJ S 124, or contact Statens vegvesen Region east, Lillehammer, fax +47 97135193. E-mail endreh@vegvesen.no 27/05.Open call for bids, deadline 21st October, 2005 for construction of the new E16 from Woyen to Bjorum, section Woyen-Isi in Bí¦rum municipality. It is a 3.9 km 4-lane road including two tunnels of 2.5 km altogether. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=171223-2005, OJ S 172, or contact Statens vegvesen, Oslo, fax +47 24058101. E-mail endreh@vegvesen.no 37/05.The lowest bidder for section Wí¸yen-Isi of the E16 from Wí¸yen to Bjí¸rum in Bí¦rum municipality is Veidekke with NOK450,666,168. The other bidders are Mesta (NOK466,264,311), Skanska (NOK498,337,649), NCC Construction (NOK505,274,553) and Leonard Nilsen & Sí¸nner (NOK511,746,240). This 3.9 km 4-lane road stretch includes two twin bored tunnels: Brenne (2 x 1,100 m, whereof 940 m in rock and 160 m in cut-and-cover) and Berghoff (2 x 1,440 m, whereof 1,310 m in rock and 130 in cut-and-cover). Visit www.vegvesen.no/region_ost/prosjekter/e16/woyen_bjorum.stm 46/05.Veidekke announced on 23rd November that it had received a NOK450.7 million road contract from the Norwegian road administration to build the new Woyen-Bjorum section of the E16 trunk road outside Oslo. In addition to the construction of a 3.9 km four-lane road the contract also includes two tunnels, slip roads and local roads. Click no/63. Visit www.veidekke.no 49/05.Open call for tenders, deadline 12th February, 2007 for control engineering for the Wí¸yen-Bjí¸rum section of the E16. The contract comprises construction of a 5 km four-lane road in Bí¦rum municipality. Half of the section is in tunnel. The main assignment for the consultant is to follow up contractors for road and tunnel works. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=258275-2006, OJ S 241, or contact Statens vegvesen, Lillehammer, fax +47 24058001. E-mail knutgl@vegvesen.no or kundesenter.oslo@vegvesen.no 01-02/07.Hifab concluded a NOK1.2 million deal for control engineering for the Wí¸yen-Bjí¸rum section of the E16. The contract comprises construction of a 5 km four-lane road in Bí¦rum municipality. Half of the section is in tunnel. The main assignment for the consultant is to follow-up contractors for road and tunnel works. Visit www.hifab.no 42/07.Open invitation to tender, deadline 1st August, 2008 for delivery and assembly of ITV/AID in the Brenne and Skui tunnels. The contract comprises of approx. 85 cameras, approx. 48 fibre modems and approx. 22,000 m of cables of varied types. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=158791-2008, OJ S 119, or contact Statens vegvesen Region east, Lillehammer, tel. +47 24058726 or 91831574. E-mail torbre@vegvesen.no 26/08.



Permalink

Open invitation to tender, deadline 17.10.2011, for construction plan and follow-up for 3.5 km-long section of E 16 Sandvika-Woyen including 2 km-long complex twin tunnel of which 0.6 km will be built using concrete. Contract duration 01.12.2011 to 01.08.2019. Register interest and obtain additional information at www.doffin.no/Search/Search_Switch.aspx?ID=234289. Further information, specs and docs from Tom Heldal Larsen at Statens vegvesen Region ost in Lillehammer, tel +47 97522474, e-mail tom.larsen@vegvesen.no, to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=278847-2011. 36/11.



Permalink

Dr.Ing. A.Aas-Jakobsen As (Oslo) secured the EUR10.5 million contract, VAT not included, for construction plan and follow-up for 3.5 km-long section of E16 Sandvika-Woyen including 2 km-long complex twin tunnel of which 0.6 km will be built using concrete. Contact Tom Heldal Larsen at Statens vegvesen Region ost in Lillehammer, tel +47 97522474, e-mail tom.larsen@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=256952-2012 and www.aaj.no. 33/12.



Permalink


Open invitation to tender, deadline 12.08.2014, for building inspection and vibration measurement in connection with blasting works during construction of 2.3 km-long Bjornegard rock tunnel, twin tube with two lanes each way on E16 Sandvika-Woyen. Contract duration 24.09.2014 to 01.02.2018. Further information, specs and docs from Jorgen Stenerud at Statens vegvesen Region oest in Lillehammer, tel +47 47623571, e-mail jorgen.stenerud@vegvesen.no, to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=199758-2014.

Ref.n. 2014/058182. 25/14.




Permalink


Open invitation to tender, deadline 03.12.2015, for the supply of lighting for the twin tube, double laned 2.3 km-long Bjornegard rock tunnel on the E16 Sandvika-Woyen. Contract duration 03.12.2015 to 14.04.2017. Contact Statens vegvesen Region East, att.n Odd Kleiven, Lillehammer, tel +47 90899345, e-mail odd.kleiven@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=364991-2015. Ref.n. 2015122182. 42/15.




Permalink


Open invitation to tender, deadline 01.02.2016, for the procurement of directional fans for the 2.3 km-long Bjornegard tunnel on the E16 Sandvika-Woyen. Contract duration is from 01.02.2016 to 07.08.2017. Contact Statens vegvesen Region East, att.n Odd Kleiven, Lillehammer, tel +47 90899345, e-mail odd.kleiven@vegvesen.no. For electronic access to information https://kgv.doffin.no/ctm/Supplier/Documents/Folder/138261. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=418879-2015. Ref.n. 15/235715. 49/15.




Permalink

Open invitation to tender, deadline 07.07.2016, for the delivery and execution of SRO installations for twin tube Bjornegard tunnel, including the portal areas and for the E16 that are in the open air. This is for the stretch from Kjorbokkrysset in the south to Voyenenga in the north, a total of 3.6 km. The contract duration is from the 10.10.2016 to 13.12.2019. For electronic access to information https://kgv.doffin.no/ctm/Supplier/Documents/Folder/144096. Contact the Norwegian Public Roads Administration, Eastern Region, att.n Odd Kleiven, Lillehammer, tel +47 91502030, e-mail odd.kleiven@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=169979-2016. Ref.n. 16/25894. 20/16.



Permalink

Norway, Vestfold - no/62

Ring Road

Open call for bids, deadline 16th February, 2004 for construction of a 4-lane ring road including a dual-lane rock tunnel in Vestfold county. Length: 2 x 1,650 m, width: 9.5 m. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=215633-2003, OJ S 242, or contact Statens vegvesen Region south, Arendal, fax +47 33355601. E-mail oddvar.bakken@vegvesen.no 02/04.



Permalink

Norway, Sogn og Fjordane - no/61

Highway

Open invitation to tender, deadline 9th December, 2003 for construction of highway E134 between Grostí¸l and Rullestadvatn west (6,048 m), including a 2,969 m-long tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=182442-2003, OJ S 202, or contact Statens vegvesen Region vest, Leikanger, fax +47 91749162. E-mail oddsav@vegvesen.no 44/03.



Permalink

Norway, Bergen - no/60

Water Treatment

Prequalification notice, deadline 15th October, 2003 for the expansion and upgrading of the Svartediket water treatment plant, 2 km southwest of Bergen city centre. Includes a new treatment plant cavern in rock (length 83 m x width 21 m x height 16 m), a new deep water intake (length 120 m x width 4 m x height 4 m), a new clean water basin in rock (length 138 m x width 18 m x height 7 m), and approximately 2.5 km of tunnel. The main tunnel will be 1.3 km-long, cross section 4.3 x 5.5 m. Other cross section will be 21 x 16 m. Planning and engineering by Asplan Viak and GeoBergen. Tunnel design by Smidt & Ingebrigtsen. Construction to start in April 2004 for completion in October 2006. Financing by the City of Bergen. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=152591-2003, OJ S 166, or contact Bergen kommune, Bergen, fax +47 55566433. E-mail rune.torsvik@bergen.kommune.no and arne.halvorsen@bergen.kommune.no 38/03.NCC has secured the construction contract for the expansion of the Svartediket water treatment plant which includes a cavern in rock (length 83 m x width 21 m x height 16 m), a water intake (length 120 m x width 4 m x height 4 m), a clean water basin in rock (length 138 m x width 18 m x height 7 m), and approximately 2.5 km of tunnel. Click no/60. Visit www.ncc.no 24/04.



Permalink

Norway, Nordland - no/59

Road

Open call for bids, deadline 30th June, 2003 for construction of 14.4 km road section Gullersfjordbotn-Austerstraumen, including the 6.4 km Sí¸rdals tunnel. It is a 8.5 m-wide single-tube tunnel to be blasted in gneiss. Rockbolts and shotcrete will be implemented for the support and dumper trucks will be used for muck removal. Cost: NOK320 million approximately, financed by the national public roads administration. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=096200-2003, OJ S 107, or contact Statens Vegvesen Region nord, Bodí¸, fax +47 75552951. E-mail firmapost-nord@vegvesen.no and einar.karlsen@vegvesen.no 24/03.The three bidders for the construction of the Gullersfjordbotn-Austerstraumen road section including the 6.4 km Sí¸rdals tunnel through the Brynjulfslí¥ttheia mountain are Scandinavian Rock Group (lowest bidder with NOK212.7 million), Leonhard Nilsen & Sí¸nner (NOK224.7 million) and Mesta AS (NOK 233.4 million). 29/03.Scandinavian Rock Group (SRG) will build road section Gullersfjordbotn-Austerstraumen, including the 6.4 km-long 8.5 m-wide Sí¸rdals tunnel, a single bore to be blasted in gneiss. Contract value NOK212.7 million. Visit www.srg.no 36/03.Open invitation to tender, deadline 7th November, 2005 for the delivery of directional control fans for four tunnels: Soerdals (6,370 m), Ingelsfjord tunnel (1,240 m), Raftsund (1,530 m) and Fjoesdal (1,600 m). Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=177580-2005, OJ S 179, or contact Statens vegvesen, Bodoe, fax +47 75586501. E-mail robjak@vegvesen.no 38/05.



Permalink

Norway, Rogaland - no/58

Road

Open call for bids, deadline 7th July, 2003 for construction of the Iversflaten tunnel, approximately 1 km, plus electro works on county road Rv 13. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=086656-2003, OJ S 96, or contact Statens Vegvesen region west, Leikanger, fax +47 57655986 or 51911791. E-mail reg-3@vegvesen.no and knut.utaaker@vegvesen.no 22/03.Open call for bids, deadline 16th May, 2006 for construction of a new 6.8 km road (Rv 519) from Hanasand to Ladstein. The project will supply a mainland connection to Finní¸y and Talgje islands from Hanasand. The project comprises an approx. 5.8 km subsea tunnel, T-crossings with access ramps in the main tunnel, an approx. 1.5 km tunnel to Talgje island and approx. 1.3 km of road in open air. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=056702-2006, OJ S 54, or contact Statens vegvesen Region west, Leikanger, fax +47 57655986. E-mail rolf.harkestad@vegvesen.no 12/06.



Permalink

Norway, More & Romsdal - no/57

Roadway

Open call for bids, deadline 26th May, 2003 for collection, interpretation and reporting of refraction and reflection seismic measurements at sea and on land for three subsea tunnel projects named Langfjord connection, Sande mainland connection and Mí¸re connection. Length is still not decided but Langfjorden will be approximately 6.7 km, Sande approximately 6.2 km and Mí¸re around 7.5 km. Tunnel profile T8.5 (width 8.5 m for two lanes). Expected geology for the Mí¸re and Langfjorden connections will be mainly gneisses and for the Sande connection, some gneisses and some limestone/marble. Drill/blast tunnelling. Support with shotcrete, rock bolts and armed shotcrete arches. Projects in early design. Estimated costs: NOK400-800 million (Langfjorden), NOK350-800 million (Sande) and NOK450-1,000 million (Mí¸re). Financing probably by toll. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=060728-2003, OJ S 69, or contact Statens Vegvesen Region Midt, Molde, fax +47 71274101. E-mail torkild.andal@vegvesen.no 19/03.



Permalink

Norway, Oslo - no/56

Highway

Open call for bids, deadline 2nd June, 2003 for construction plans, tender documents and follow-up during construction for a new 700 m immersed tunnel under the Oslo harbour at Bjí¸rvika between the Festnings tunnel and the Ekeberg tunnel on road E18, including connections with the existing road/street network. The works consist of engineering design services for big concrete constructions, complicated foundation works and rock tunnels. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=063650-2003, OJ S 72, or contact Norwegian national road administration, Oslo, fax +47 23054158 or 4001. E-mail svein.roed@vegvesen.no. Visit www.vegvesen.no/oslo/bjorvika/bjorvika.stm 16/03.Open procedure, deadline 20th May, 2005 for construction of the Bjoervika immersed tunnel under Oslo Harbour. It is a 675 m tunnel connecting the existing Festning and Ekeberg tunnels. The tunnel has 2 x 3 lanes. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=031938-2005, OJ S 33, or contact Statens vegvesen Region east, Lillehammer, fax +47 61257480 or 24058774. E-mail firmapost@vegvesen.no or sveroe@vegvesen.no. Subscribe to E-News Weekly 4/2005. 08/05.The Norwegian public roads administration announced its intention to award the Sjoedel contract to Skanska, Bam Civiel and Volker Stevin, who submit an offer of NOK968 million for the immersed tunnel piece in the Bjoervika project at Oslo harbour. The project consists of a 670 m-long 35 to 40 m-wide 6-element immersed tube at 112 m under the sea level. The contract is expected to be signed at the beginning of August with work on site starting at the beginning of September when the necessary detailed plans/documentation have been approved. Completion is expected in 2010. Another contract for this project has also been signed. Subscribe to E-News Weekly 28/2005 & 23/2005 and read E-News Weekly 4/2005. Visit www.skanska.no 28/05.Open call for tenders, deadline 5th November, 2007 for delivery of booster fans for the Bjí¸rvika tunnels in Oslo including a 675 m-long immersed tunnel under the harbour and its ramps, 503 m of cut-and-cover tunnels and ramps totalling 1.2 km with a rectangular shape for one, two or three lanes at Sí¸renga, a new 420 m-long 9.5 m-wide rock tunnel in Mosseveien/Grí¸nlia and 620 m of enlarged existing tunnels and the ramps. Read E-News Weekly 39/2007, 40/2005, 28/2005, 26/2005, 23/2005, 4/2005, 18/2002 & 10/2002. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=223948-2007, OJ S 183, or contact Statens vegvesen Region east, Lillehammer, tel. +47 81522000 or 24058759. E-mail mari.barstad@vegvesen.no. Also visit www.vegvesen.no/bjorvika 40/07.Open call for tenders, deadline 22nd May, 2008 for fire protection of the Bjí¸rvika tunnel in Oslo. The contract includes delivery and installation of fire protection on the roof and walls (approx. 39,400 sq m and approx. 10,850 sq m, respectively), delivery and installation of fireproof seals in structure joints (approx. 350 m of element joints in the immersed tunnel section, approx. 1,300 m of segment joints in the immersed tunnel section and approx. 3,300 m, of section joints in the cast-on-site section of the tunnel), engineering design/detailed planning of fire protection/fireproof seals as described above. Read E-News Weekly 39/2007, 40/2005, 28/2005, 26/2005, 23/2005, 4/2005, 18/2002 & 10/2002. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=279483-2007, OJ S 229, or contact Statens vegvesen region east, Lillehammer, tel. +47 81 522000 or fax +47 24058774. E-mail kjell.furre@vegvesen.no 49/07.Vifter & Miljí¸ received a NOK5 million contract for delivery of booster fans for the Bjí¸rvika tunnels in Oslo including a 675 m-long immersed tunnel under the harbour and its ramps, 503 m of cut-and-cover tunnels and ramps totalling 1.2 km with a rectangular shape for one, two or three lanes at Sí¸renga, a new 420 m-long 9.5 m-wide rock tunnel in Mosseveien/Grí¸nlia and 620 m of enlarged existing tunnels and the ramps. Visit www.vifter.no 12/08.Invitation to tender for delivery and installation of shaft fans and associated equipment at four ventilation towers at Bjorvika tunnels on highway E18 in Oslo. http://ted.europa.eu/udl?request=Seek-Deliver&language=es&docid=268483-2008 OJ S202 Tender deadline 27.11.2008 for commencement of works on 19.01.2009 and completion by 01.11.2009. Contact e-mail kjetil.flotre@vegvesen.no tel +47 81 52 20 00. 43/08.



Permalink

Open invitation to tender, deadline 11.05.2009, for delivery of 23 controllable barriers with foundations for newly established closing points in Festning, Bjorvika and Ekeberg tunnels and other associated places on E18 highway. Contract to start 08.06.2009 for completion 01.03.2011. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=091065-2009Open invitation to tender, deadline 12.05.2009, for 12 LED variable information boards and road signs for Bjorvika tunnel on E18 highway. Contract to start 09.06.2009 for completion 15.02.2010. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=091066-2009More information, including specs and docs for both bids, from Kjetil Flotre at Statens vegvesen in Lillehammer, tel +47 8152 2000, e-mail kjetil.flotre@vegvesen.no. 14/09.



Permalink

Contract for concrete elements for fireproofing walls of concrete tunnels in the Havnelageret, Sjodelen and Sorenga areas of Bjorvika project awarded to BetongPartner AS, Teglversveien 18, Andalsnes, Norway, value EUR3,467,613 excluding VAT. Typical dimensions of the concrete elements, which are to be tiled on the side facing traffic, are 12-15 cm thickness, 3.5 m height, and 3.3 m length, and a total area of 21,200 sq m is required. See tunnelbuilder archive no/56 for project history. More from BetongPartner, tel +47 712277-40, fax -41, e-mail kontor@betong-partner.no. Further project details from Kjell Furre at Statens vegvesen in Lillehammer, tel +47 81522000, e-mail kjell.furre@vegvesen.no. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=098031-2009 15/09.



Permalink

Open invitation to tender, deadline 10.06.2009, for delivery and installation of pumps with associated equipment at the pumping station in the Gronlia tunnel of the E18 Bjorvika project. Contract to commence 10.07.2009 for completion 20.11.2009. Specs and docs from Kjetil Flotre at Statens vegvesen in Oslo, tel +47 81522000, e-mail kjetil.flotre@vegvesen.no to whom tenders or requests to participate should be sent. 19/09. Site inspection scheduled for 11.05.2009 at 12.00. http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=124622-2009. 19/09.



Permalink

Open invitation to tender, deadline 24.02.2017, for the renovation of Ekeberg (1580 m, 1580 m) and Svartdals (1460 m, 1700 m) tunnels on the E6/E18 in Oslo, the eastern part of the Opera tunnel. The VALUE Range of the contract is EUR44 - 60.49 million, excluding VAT.

For electronic access to information https://kgv.doffin.no/ctm/Supplier/Documents/Folder/150443. Tenders must be sent to the Norwegian Public Roads Administration, Eastern Region, attn Kjetil Flotre, Oslo, tel  +47 91139522, e-mail kjetil.flotre@vegvesen.no. Contact The Norwegian Public Roads Administration, Eastern Region, attn Pernille| Reistadbakken, Lillehammer,  tel +47 91502030, e-mail firmapost-ost@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=456612-2016. Ref.n. 16/73369. 52/16.



Permalink

Skanska has signed the EUR54.56 million contract for the renovation of the Ekeberg (1580 m, 1580 m) and Svartdals (1460 m, 1700 m) tunnels on the E6/E18 in Oslo, Norway. The project consists mainly of electrical work, fire protection and improved cleaning solutions for the tunnels. In addition, new technical buildings will be built, evacuation routes will be upgraded, a new layer of asphalt will be added and all signs will be replaced. The work will begin in the summer of 2017 and will be completed before summer 2019. Contact The Norwegian Public Roads Administration, Eastern Region, attn Pernille| Reistadbakken, Lillehammer,  tel +47 91502030, e-mail firmapost-ost@vegvesen.no. Visit http://group.skanska.com/media/203108/Skanska-renovates-tunnels-in-Oslo%2c-Norway%2c-for-NOK-516M%2c-about-SEK-550M. Ref.n. 16/73369. 19/17.



Permalink

Skanska Norge AS from Oslo secured the contract for the renovation of the Ekeberg (1580 m, 1580 m) and Svartdals (1460 m, 1700 m) tunnels on the E6/E18 in Oslo, which is the eastern part of the Opera tunnel. Contact The Norwegian Public Roads Administration, Eastern Region, attn Pernille| Reistadbakken, Lillehammer,  tel +47 91502030, e-mail firmapost-ost@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=318393-2017. Ref.n. 16/73369. 32/17.



Permalink

Competitive procedure with negotiation, deadline 04.02.2019, for the renovation of the Festning tunnel on the E18 highway in Oslo, also the western part of the Opera tunnel and the pump station at Bygdoylokket. The value of the contract is EUR19.42 million, excluding VAT, and the duration of the contract is 17 months. For bid documents and further information  http://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=225727&B=VEGVESEN where offers must be sent. Contact Norwegian Public Roads Administration in Oslo, attn Bjorn Oystein Kroken, tel +47 47272268, email bjorn.kroken@vegvesen.no.Visit

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=004419-2019.

Ref.n. 18/222374. 02/19.



Permalink

Skanska Norge AS from Oslo secured the EUR27.59 million (NOK267.19 million) contract, excluding VAT, for the renovation of the Festning tunnel on the E18 highway in Oslo, also the western part of the Opera tunnel and the pump station at Bygdoylokket. Contact Norwegian Public Roads Administration in Oslo, attn Bjorn Oystein Kroken, tel +47 47272268, email bjorn.kroken@vegvesen.no.Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=285725-2019.

Ref.n. 18/222374. 26/19.



Permalink

Norway, Hordaland - no/55

Hydropower

Periodic information notice, deadline 17th March, 2003 for construction of the Blí¥fjell power station including a 6.2 km tunnel and a new underground power house. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=038359-2003, OJ S 44, or contact Sunnhordland Kraftlag, Stord, fax +47 53414170. E-mail dagfinn.vatne@sunnhordland-kraftlag.no 11/03.NCC is building the Sima hydro power project in Eidfjord for Statkraft Energi at a cost of NOK31.5 million. The project includes a 1.6 km water tunnel, excavated section 11 sq m, and a 160 m access tunnel, excavated section 14 sq m. Other underground structures include a short shaft (3-5 m) to the inlet concrete construction in Onevatn and another short shaft (2 m) to the existing water tunnel with connection to the Sima power plant. Concrete plug with steel pressure gate in the access tunnel. The excavation method is drill and blast with three drives for the water tunnel. First, 2 x 450 m is bored in alternate excavation from the access tunnel's end. Then, approx. 700 m will be excavated in one-way excavation. One Atlas Copco AC 282 jumbo (model approx. 1995) is used. The geology is massive bedrock (gneiss, granite and megmatite). Support with Orsta bolts, in average 0.2 per metre of tunnel. Loading and haulage with one Toro 301 underground loader equipped with 3 cu m bucket (2 tractors with strengthened trailers). The site is without road access, located approx. 1,000 m above sea level. All equipment transportation is done by helicopter and snow vehicles. The tunnel started on 15th May, 2005 and is expected to finish on 15th October, 2005. All works (except final clearing of the tunnel and inlet sites) to be finished on 1st December, 2005. Visit www.ncc.no, www.atlascopco.com, www.toro.sandvik.com and www.orstastaal.no 35/05.



Permalink