A referendum will be held on 28.02.2016 for Swiss citizens will make a decision about the federal government proposal to build a second tube for the Gotthard road tunnel under the Alps before renovating the existing facility. The value of the project is EUR2.59 billion(CHF2.8 billion). Once a second tube is completed, the existing road tunnel, opened in 1980, would be closed to traffic for renovations, but the traffic flow will not interrupted. After that is finished by around 2030, the two tubes would each carry only one lane of traffic in each direction. For further information click here and here and also visit https://www.admin.ch. 45/15.
03.07.2025 Czech Republic
04.07.2025 Norway
09.07.2025 Spain
10.07.2025 Germany
15.07.2025 Spain
21.07.2025 Czech Republic
22.07.2025 France
28.07.2025 Austria
28.07.2025 Brazil
29.07.2025 Czech Republic
29.07.2025 Germany
31.07.2025 France
05.08.2025 Poland
11.08.2025 Switzerland
14.08.2025 Switzerland
14.08.2025 Italy
19.08.2025 Spain
01.09.2025 Switzerland
01.09.2025 Brazil
02.09.2025 Spain
15.09.2025 Italy
15.09.2025 Sweden