A referendum will be held on 28.02.2016 for Swiss citizens will make a decision about the federal government proposal to build a second tube for the Gotthard road tunnel under the Alps before renovating the existing facility. The value of the project is EUR2.59 billion(CHF2.8 billion). Once a second tube is completed, the existing road tunnel, opened in 1980, would be closed to traffic for renovations, but the traffic flow will not interrupted. After that is finished by around 2030, the two tubes would each carry only one lane of traffic in each direction. For further information click here and here and also visit https://www.admin.ch. 45/15.
12.01.2026 Austria
14.01.2026 Netherlands
15.01.2026 Spain
16.01.2026 Germany
20.01.2026 Romania
23.01.2026 Switzerland
23.01.2026 Ireland
26.01.2026 Italy
26.01.2026 Germany
29.01.2026 Bosnia and Herzegovina
04.02.2026 Germany
06.02.2026 Spain
09.02.2026 Norway