The Joint Venture Zamora -Pedralba-Taboadela, composed of Sociedad Iberica de Construcciones Elecricas SA and Syneox Rail SLU, from Madrid, secured the EUR9.38 million contract, excluding VAT, for the comprehensive management service for civil protection facilities in the following 29 tunnels on Zamora-Pedralba-Taboadela section, Madrid- Galicia high-speed line:
- section Zamora-Pedralba: Otero (1183 m) , Puebla de Sanabria (1538 m), Bolon (430 m), Valorio (193 m), Campina (200 m), Tunel I (185 m), Tunel II (100 m), Ecoducto Otero de Bodas (200 m), Ecoducto Monmbuey (220 m), Boveda Arroyo Calzada (110 m);
- section Pedralba-Vilarino: Pedralba (1670 m), Requejo (2518,44 m, 2466,39 m), Padornelo (5964,17, 6382,66 m), Avesedimas (415,1 m), Hedroso (693,72, 896,6 m), Lubian (1686,58 m, 1693,58 m), La Canda (7287,82 m, 7284,84 m), Vilavella (853,78 m, 886,78 m), O Canizo (5350,92 m, 5353,17 m), Espino (7893,62 m, 7907,69 m);
- sezction Vilarino-Taboadela: Bolanos (6754,05 m, 6770,94 m), Portocamba (3730,16 m, 3665,51 m), Cerdedelo (1687,52 m, 1682,52 m), El Corno (8556,37 m, 8548,92 m), Corga de vela (1134,80 m, 1133,98 m), Prado (7597,12 m, 7575,71 m), Seiro (1780,81 m), Bouzas (825,42 m), Os Casares (3457,76 m).
Contact Adif-Alta Velocidad, Madrid, tel 34 913007453, email comprascontratacion@adif.es. Visit https://ted.europa.eu/en/notice/-/detail/19520-2025. Ref.n. 2.23/21506.0039. 03/25.