Open invitation to tender, deadline 19/06/2023, for rock securing, mainly with bolts and concrete, in the following tunnels Bomlafjord (7900 m) on E39 in Vestland County ; Byfjord (5800 m), Hklepp (609 m) and Mastrafjord (4400m) on E39 in Rogaland County. For tender documents click here, where tenders must be sent. Value of the contract is EUR 10.26 million (NOK120 million), excluding VAT. Duration of contract is from 10/08/2023 to 30/06/2024. Contact the Norwegian Public Roads Administration, attn Linda Kristine Brandskogsand, Moss, tel +47 48059437, email linda.brandskogsand@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=300853-2023 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=286320-2023. Ref. n. 23/39039. 20/23.
Norway-Moss: Road tunnel construction work
Notice for changes or additional information
Legal Basis:
Directive 2014/24/EU
Section I: Contracting authority/entity
Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
Framework agreement for rock protection in tunnels
Reference number: 23/39039
II.1.2)Main CPV code
45221241 Road tunnel construction work
II.1.3)Type of contract
Works
II.1.4)Short description:
Framework agreement for rock protection in tunnels in the Rogaland area and in parts of Vestland County. The contract will mainly be based on the execution of shortcomings and errors after geological main inspections, which will be available before each measure.
Most of the work will be protection with bolts and concrete in tunnels, there will also be
the removal of netting/sheet arching/PE foam and scanning as required. There can be minor amounts of blasting/pigging. The contract will be for one year, contract 2023-2024, in which Mastrafjord, Byfjord, Håklepp, and Bømlafjord tunnels are to be improved in accordance with the main inspections, see the annex. The reports for Mastrafjord and Byfjord tunnels are completed, whilst the reports for Håklepp and Bømlafjord tunnels are being prepared.
The scope of the framework agreement for 2023-2024 is estimated to be NOK 30 million excluding VAT. Further scopes are dependent on allocations. The maximum turnover for the framework agreement is estimated to be NOK 120 million excluding VAT for the entire contract period, including the options (1+1+1).
Section VI: Complementary information
VI.5)Date of dispatch of this notice:
16/05/2023
VI.6)Original notice reference
Section VII: Changes
VII.1)Information to be changed or added
VII.1.2)Text to be corrected in the original notice
Section number: IV.2.2
Instead of:
Date: 12/06/2023
Local time: 12:00
Read:
Date: 19/06/2023
Local time: 12:00
Section number: IV.2.7
Instead of:
Date: 12/06/2023
Local time: 12:00
Read:
Date: 19/06/2023
Local time: 12:00