The JV Salini Impregilo SPA (Milan)/CSC Entreprise de constructions SA (Lugano)/VINCI Constructions France TP Lyon (Villeurbanne)/Dodin Campenon Bernard (Toulouse) secured the EUR40.09 million contract, excluding VAT, for the construction of intersections and reversal of trains. Also to provide the equipment inside the Maddalena tunnel, the transport and the depositing of the excavated materials at Chiomonte (Italy) for the new Lyon-Turin rail link. Contact TELT sas, Le Bourget du Lac, fax +33 479685683, email fonction.marches@ltf-sas.com. For tender information please click here. 16/20.