Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Georgia

Georgia, Munich - ge/37

Ring Road


Weiser GmbH from Munich secured the contract for maintenance and inspection of the firefighting systems in the Munich road tunnels. Contact Landeshauptstadt München, Baureferat, Monaco, email bekanntmachungen.vz2.bau@muenchen.de. For further on the tender, please click here. Ref.n. J60143419. 02/21.

 




Permalink

Georgia, Tbilisi - ge/20

Metro

Closing Date: 09.09.2020 (Tender Closed)

Prior information notice without call for competition, deadline 09/09/2020, for the Tbilisi Metro Project, requiring the procurement of 10 new metro cars, the modernization of depot – tbc and the metro tunnel rehabilitation – tbc. Contact Tbilisi Transport Company, Tbilisi, attne Sig  Giorgi Dolidze, tel +995 577 22 82 78, email gdolidze@metro.ge, cc: mbaratashvili@metro.ge. Visit TED and click here for more information. Ref.n. 9507-GPN-51392. 38/19.



Permalink

Georgia, Imereti - ge/19

Highway

Closing Date: 13.07.2018 (Tender Closed)


Restricted invitation to tender, deadline 13.07.2018, for the consultancy service for the supervision of the construction of approximately 13 km Ubisa-Shorapani (F3) road section for the E-60 Highway, including 9 double tunnels (from 300 m to 1,6 km length). Value of the contract is EUR10.3 million, excluding VAT. Contact Roads Department of the Ministry of Regional Development and Infrastructure of Georgia, attn. Mr. Levan Kupatashvili, Tbilisi, email info@georoad.ge, n.papunidi@gmail.com, vakhtang.razmadze@georoad.ge. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=252099-2018.

Ref. n. GTC/CS/QCBS-03. 24/18.




Permalink

Georgia, Mtskheta-Mtianeti Region - ge/18

Highway

Closing Date: 27.03.2017 (Tender Closed)

Open invitation to tender, deadline 27.03.2017, for the construction of  a 1.2km tunnel in the Devdoraki Gorge includes construction of nearby roads to connect to the highway of the Mtskheta-Stepantsminda-Larsi with Russia.Value. The contract, including VAT, is EUR22.44 million (GEL59.75 million). Construction works should be finished within a year after the signing of the agreement. This road section is located in Kazbegi municipality. Further information from Ministry of Regional Development and Infrastructure of Georgia, Department of Roads of Georgia, attn Shalva Julakidze, Levan Rostomashvili , Tbilisi, tel          +995 322 370508 (284, 292), 595 219055, email levan.rostomashvili@georoad.ge. Visit http://www.georoad.ge. Rif.n. DAP170000034     . 12/17.



Permalink

Georgia, Shida Kartli - ge/17

Highway


IRD Engineering Srl from Rome secured the EUR1.08 million (GEL3.09 million) contract for supervision of construction works for upgrading of the E60 Highway Zemo Osiauri-Chumateleti (Rikoti Tunnel East Portal section) (Lot 1 - km0 - km5+800) (Lot 2 - km5+800-km14+066). The contract includes 21 bridges and 5 tunnels, and their related structures, and the upgrading and widening of the Rikoti tunnel, a 1722m single tube tunnel. The duration of the contract is 38 months. Works will be carried out under the EWHCIP (East-West Highway Corridor Improvement Project), a project financed by the World Bank which aims to upgrade the Georgian part of the European Route E60, which connects the Poti Port on the Black sea to the Azerbaijan border. For further information please visit http://www.georoad.ge/?lang=eng&act=tenders&func=menu&uid=1484308259. Ref.n. EWHCIP/CS/QCBS-01. 03/17.




Permalink

Georgia, Abkhazia - ge/16

Hydro

Closing Date: 05.01.2018 (Tender Closed)


Prior information notice without call for competition, deadline 05.01.2018, for Enguri HPP Rehabilitation Project Phase IV,  The EUR33 million project  includes civil works on the 15.1 km headrace tunnel, E&M works on Enguri switchyard, hydro-mechanical on penstocks and gates, Enguri reservoir sediment management and consultancy assignment. Contact Engurhesi Ltd., Tbilisi, attn Mr  Malkhaz Tskvitishvili, tel +995 32 188011, fax +995 32 188022, emails Info@engurhesi.ge, malkhaz@caucasus.net. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=009599-2017 and http://www.ebrd.com/work-with-us/procurement/p-pn-170105c.html. Ref.n. 8521-GPN-04304. 02/17.




Permalink

Georgia, Svaneti - ge/15

Hydro


Salini Impregilo signed in Tibilisi an EPC contract worth USD575 million for the design and construction of the Nenskra hydroelectric project in the mountainous region of Svaneti, in the northwest of the Country. The project will be composed of a asphalt face rockfill dam (135 m high and 820 m long), a weir on the Nakra river (9 m high and 50 m long). The project includes a transfer tunnel (14.4 km long with 3.5 m diameter), a  headrace tunnel (15.6 km long and 4.5 m diameter). The transfer tunnel will take Nakra River’s water to the new reservoir, optimizing the project’s performance. The tunnel will be built by TBMs. The once the contract is signed the time given is 62 months  within which time the work will have to be completed. Visit http://www.salini-impregilo.com/en/. 39/15.




Permalink

Invitation for pre-qualification, deadline 06.12.2018, for the detailed design, procurement and construction of a 130m high rockfill dam with asphaltic face on thee Nenskra River. This includes a 15km long concrete lined headrace tunnel, a 1.8km long steel penstock, an open-air powerhouse with an installed capacity of 280MW, a 9m height concrete weir on Nakra River, a 12.5km long concrete lined transfer tunnel from the weir to the dam reservoir, and all ancillary and related works. The Contract is expected to be implemented from beginning of May 2019 to end of April 2024. Contact JSC Nenskra Hydro , att.ne Mr. Youngtak Choi and/or Dr. Fadi Hachem, Tbilisi,  email youngtak.choi@nenskrahydro.ge and/or fhachem@stucky.ch.

Visit https://www.ebrd.com/work-with-us/procurement/p-pn-181107b.html and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=491430-2018.

Ref.n. 9275-GPN-46778. 45/18.



Permalink

Georgia, Tbilisi - ge/14

Railways

General Procurement Notice for development of railway bypass in Tbilisi. The project requires about 30 km of railway infrastructure including tunnels, and consultancy services related to project implementation and the supervision of works. Estimated cost, EUR230 million. Prequalification for the above contracts is expected to begin in the fourth quarter, 2009. For more, click here. Contact Georgian Railway LLC, Mr Dimitri Kemoklidze, Tbilisi, tel +99532 563159, fax +99532 564857, email dkemoklidze@railway.ge. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=233198-2009 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=268129-2009. 40/09.



Permalink

Request for Expressions of Interest, deadline 04.12.2009, for the construction of a new railway bypass around the city of Tbilisi and the redevelopment of an existing alignment. Maximum estimated cost, EUR250 million. Contact Giorgi Gurgenidze at Georgian Railway LLC in Tbilisi, Georgia, tel/fax +995 (32) 563185, e-mail ggurgenidze@railway.ge and Dimitri Kemoklidze, tel +99532 563159, fax +99532 564857, e-mail dkemoklidze@railway.ge. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=320839-2009. 48/09.



Permalink

Georgia, Shida Kartli - ge/13

Highways

Italian company Todini secured contract 3 for construction of the four-lane motorway from Liakhvi to Ruisi (km 85+850 - km 94+531). Contract duration 24 months, value EUR56 million. The 3 km alignment includes an 11 m-diameter twin tube tunnel, each with two lanes, 800 m-long. The contract is part of the upgrading of a 14.7 km section of E-60 Sveneti-Ruisi highway. For more on the project click here and visit www.todini.it. 30/09.



Permalink

Georgia, Samtskhe-Javakheti - ge/12

Hydroelectric

Closing Date: 23.07.2009 (Tender Closed)

Invitation for Expressions of Interest, deadline 23.07.2009, for participation in 38-42 MW Mtkvari Hydro Power Plant Construction Project at Samtskhe-Javakheti Region on the river Mtkvari. The project includes a 9.5 km-long derivational tunnel and an 80 m-long tailrace tunnel. For more information contact Mtkvari HPP LLC in Tbilisi, Georgia, tel +995 32393256, mob +995 95309950. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=178403-2009 29/09.



Permalink

Robbins 5.3 m-diameter main beam TBM with continuous conveyor underway on 5.5 km-long headrace drive through slate, sandstone and malm at difficult location in Kazbegi mountains, 1,700 m ASL and 160 km from capital Tbilisi. 60 MW plant, which will draw water from Tergi river near Russian border, will be operational in 2016. Read the press release and visit www.robbinstbm.com. 23/12.



Permalink

Hydropower

Page: