Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

India

India, Bihar - in/90

Metro

Closing Date: 05.11.2020 (Tender Closed)

Open invitation to tender, deadline 05/11/2020, for design and construction of a twin tunnel by Shield TBM, Tunnel by Cut & Cover, Underground Ramp at Rajendra Nagar and Six Underground metro stations viz. Rajendra Nagar, Moin Ul Haq Stadium, University, PMCH, Gandhi Maidan & Akashvaniwith Entry/Exits & Connecting subway including Architectural Finishing, Water Supply, Sanitary Installation & Drainage works on New ISBT to Patna Station of corridor-2 of Phase-I of Patna MRTS. Value contract EUR1.12  million (IDR19.59 bn). Duration of the contract is 42 months. Last date of seeking clarifications 08/10/2020.  For attending Pre Bid Meeting on 09-Oct-2020 11:00 AM, please provide details of the person(s) participating in meeting by  1100 Hrs on 08/10/2020. on gmcontracts(at)dmrc.org. Contact Delhi Metro Rail Corporation, attn Sr. GM/Contract, New Delhi, Visit https://eprocure.gov.in/eprocure/app.  Ref. PC-03. 40/20. 




Permalink


Larsen e Toubro Limited di Manapakkam (Chennai) secured the EUR 250.82 million (INR19,89 bn) contract for design and construction of a twin tunnel by Shield TBM, Tunnel by Cut & Cover, Underground Ramp at Rajendra Nagar and Six Underground metro stations viz. Rajendra Nagar, Moin Ul Haq Stadium, University, PMCH, Gandhi Maidan & Akashvani with Entry/Exits & Connecting subway including Architectural Finishing, Water Supply, Sanitary Installation & Drainage works on New ISBT to Patna Station of corridor-2 of Phase-I of Patna MRTS. Contact Delhi Metro Rail Corporation, New Delhi. Visit https://eprocure.gov.in/eprocure/app.  Ref. PC-03, Tender 2020_DMRC_585106_1. 02/22.  



Permalink


Invitation for bids/tenders, deadline 13/02/2024, for the design and construction of a twin tunnel by Shield TBM, Tunnel by Cut and Cover, Underground Ramp at Mithapur and 3 Underground Metro stations (Viz. Vikas Bhawan, Vidyut Bhawan and Patna) including Architectural Finishing, Water Supply, Sanitary Installation & Drainage Works of Stations on Danapur to Khemnichak Corridor 1 of Phase-I of Patna MRTS. Duration of the contract is 42 months. A Pre Bid On-line Meeting will be held on 12-Jan-2024 11:00 AM. Contact Delhi Metro Rail Corporation Ltd, attn Senior General Manager/Contract, New Delhi, tel +91 11 23415838, email gmcontracts@dmrc.org. Visit https://eprocure.gov.in/eprocure/app.  Ref. PC-05. 01/24 



Permalink


Hindustan Construction Company Limited (HCC) has been awarded two contracts valued at EUR 135.89 million (INR14.18 bn) and EUR 109.93 million (INR11.48 bn), respectively, by the Patna Metro Rail Corporation Limited (PMRCL). The contracts involve the construction of 10.67 km of underground tunnels using Tunnel Boring Machines (TBM) and six metro stations under Phase I of the Patna Metro Rail Project. Package PC-05 includes the design and construction of twin tunnels using a shield TBM, a cut-and-cover tunnel, an underground ramp at Mithapur, and three metro stations: Vikas Bhawan, Vidyut Bhawan and Patna Station. Package PC-06 comprises an underground ramp at Rukanpura and three metro stations:Rukanpura, Raja Bazar and Patna Zoo. Visit https://hccindia.com/ and https://eprocure.gov.in/eprocure/app. Ref. PC05 and PC-06. 39/25.



Permalink