Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Brazil

Brazil, Sao Paulo - br/27

Metro Line 2

Consortium CRAlmeida-Ghella (35 percent)-Consbem secured the EUR620 million contract to design and build the 6.5 km-long Sao Paulo green metro line 2 extension, lot 2. The new 10.4 m-diameter underground section will be built by TBM for 5.8 km, and will include two stations (Penha and Penha de Franca) and seven shafts. Duration of works 72 months. Read the press release. 39/14.



Permalink


Consortium Linha 02 Verde – Vila Prudente-Dutra, composed of Sacyr Ingeniería e Infraestructuras, Galvao Engenharia e SA Paulista, secured the EUR 443.2 million (BRL1.9 bn) contract to build the 7.3 km-long Sao Paulo green metro line 2 extension, lot 1. Duration of contract 69 months. The new underground section will connect Vila Prudente station with Dutra. Visit https://sacyrinfraestructuras.com/https://www.galvao.com/ and https://www.sapaulista.com.br/. 39/14.



Permalink