Consortium Linha 02 Verde – Vila Prudente-Dutra, composed of Sacyr Ingeniería e Infraestructuras, Galvao Engenharia e SA Paulista, secured the EUR 443.2 million (BRL1.9 bn) contract to build the 7.3 km-long Sao Paulo green metro line 2 extension, lot 1. Duration of contract 69 months. The new underground section will connect Vila Prudente station with Dutra. Visit
https://sacyrinfraestructuras.com/,
https://www.galvao.com/ and
https://www.sapaulista.com.br/. 39/14.