Consortium CRAlmeida-Ghella (35 percent)-Consbem secured the EUR620 million contract to design and build the 6.5 km-long Sao Paulo green metro line 2 extension, lot 2. The new 10.4 m-diameter underground section will be built by TBM for 5.8 km, and will include two stations (Penha and Penha de Franca) and seven shafts. Duration of works 72 months. Read the press release. 39/14.