Italy,
Sicily
- it/267
Railway
The JV Sintagma Srl from Perugia (leader), Rocksoil SpA from Torre Boldone (BG) and E.D.IN. Srl from Rome secured the EUR 6.7 million contract, excluding VAT, for the qualified support on definitive design of the new railway connection Palermo - Catania, Lercara branch - Caltanissetta Xirbi section (lot 3) and Caltanissetta Xirbi - Enna section (Lot 4a).
The section between the stations Lercara branch (included) and Caltanissetta Xirbi (included) is 48 km long, 21 km of which will be underground with 7 tunnels, whose length is between 1 km and 8 km. The section between the stations Caltanissetta Xirbi (not included) and Enna (included) is 27 km long, 20 km of which underground with 3 tunnels, whose length is between 2 km and 13 km.
Contact Italferr SpA, attn Angelo Putaturo, Rome, tel +39 0649752446, fax +39 0649752445, email gareappalti.italferr@legalmail.it. For tender documents please click here. Ref.n. RdA-39152. 44/19.
Open invitation to tender, deadline 25/07/2022, for the design and construction of the Nuova Enna – Dittaino section (Lot 4B) on the Palermo – Catania railway, including 3 tunnels, total length 8.5 km and a 1km viaduct. The contract includes the Enna Nuova new station and the refurbishment of Dittaino station. Please click here for tender documents, where tenders must be sent. Value of the contract will be EUR654.04 million, excluding VAT: EUR310.66 million belong to OG4 category. Duration contract 1540 days. Contact RFI, attn Luca Lancieri, Rome, email l.lancieri@rfi.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=331643-2022. Ref.n. DAC.0091.2022. 27/22.
Italy-Rome: Railway construction works
2022/S 117-331643
Contract notice – utilities
Legal Basis:
Directive 2014/25/EU
Section I: Contracting entity
I.1)Name and addresses
Official name: Rete Ferroviaria Italiana
National registration number: DAC.0091.2022
Postal address: Via dello Scalo Prenestino 25
Town: Roma
NUTS code:
ITI43 Roma
Postal code: 00159
Country: Italy
Contact person: Responsabile del Procedimento per la fase di affidamento: Luca Lancieri
E-mail:
l.lancieri@rfi.it
Internet address(es):
Main address:
www.acquistionlinerfi.it
Address of the buyer profile:
www.gare.rfi.it
I.6)Main activity
Railway services
Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
GPA per la progettazione esecutiva e l’esecuzione in appalto dei lavori di realizzazione della linea ferroviaria Palermo – Catania, tratta Nuova Enna – Dittaino (Lotto 4B).
Reference number: DAC.0091.2022
II.1.2)Main CPV code
45234100 Railway construction works
II.1.3)Type of contract
Works
II.1.5)Estimated total value
Value excluding VAT: 654 041 552.61 EUR
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.3)Place of performance
NUTS code: ITG16 Enna
II.2.6)Estimated value
Value excluding VAT: 654 041 552.61 EUR
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Duration in days: 1540
This contract is subject to renewal: no
Section IV: Procedure
IV.2)Administrative information
IV.2.2)Time limit for receipt of tenders or requests to participate
Date: 25/07/2022
Local time: 12:00
IV.2.3)Estimated date of dispatch of invitations to tender or to participate to selected candidates
IV.2.4)Languages in which tenders or requests to participate may be submitted:
Italian
Section VI: Complementary information
VI.5)Date of dispatch of this notice:
15/06/2022
Open invitation to tender, deadline 18/07/2022, for the design and construction of the Dittaino - Catenanuova section (Lot 5) on the Palermo – Catania railway, including the new Catenanuova station and the new alignment 7 km of viaducts and 2.3 km of tunnels. Please click here for tender documents, where tenders must be sent. Value of the contract EUR 612.72 million, excluding VAT. Duration of the contract will be 1329 days. Contact RFI, attn Luca Lancieri, Rome, email l.lancieri@rfi.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=319624-2022. Ref.n. DAC.0092.2022. 27/22.
Italy-Rome: Railway construction works
2022/S 113-319624
Contract notice – utilities
Legal Basis:
Directive 2014/25/EU
Section I: Contracting entity
I.1)Name and addresses
Official name: Rete Ferroviaria Italiana
National registration number: DAC.0092.2022
Postal address: Via dello Scalo Prenestino 25
Town: Roma
NUTS code:
ITI43 Roma
Postal code: 00159
Country: Italy
Contact person: Responsabile del Procedimento per la fase di affidamento: Luca Lancieri
E-mail:
l.lancieri@rfi.it
Internet address(es):
Main address:
www.acquistionlinerfi.it
Address of the buyer profile:
www.gare.rfi.it
I.6)Main activity
Railway services
Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
GPA per la progettazione esecutiva e l’esecuzione in appalto dei lavori di realizzazione della linea ferroviaria Palermo – Catania, tratta Dittaino - Catenanuova (Lotto 5)
Reference number: DAC.0092.2022
II.1.2)Main CPV code
45234100 Railway construction works
II.1.3)Type of contract
Works
II.1.5)Estimated total value
Value excluding VAT: 612 717 250.42 EUR
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.3)Place of performance
NUTS code: ITG1 Sicilia
II.2.6)Estimated value
Value excluding VAT: 612 717 250.42 EUR
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Duration in days: 1329
This contract is subject to renewal: no
Section IV: Procedure
IV.2)Administrative information
IV.2.2)Time limit for receipt of tenders or requests to participate
Date: 18/07/2022
Local time: 12:00
IV.2.3)Estimated date of dispatch of invitations to tender or to participate to selected candidates
IV.2.4)Languages in which tenders or requests to participate may be submitted:
Italian
Section VI: Complementary information
VI.5)Date of dispatch of this notice:
09/06/2022
RFI secured to the Joint Venture Rizzani de Eccher (leader), Manelli Impresa and Sacaim the EUR588 million contract for the design and construction of the Dittaino - Catenanuova section (Lot 5) on the Palermo - Catania railway, including the new Catenanuova station and the new alignment 7 km of viaducts and 2.3 km of tunnels. Contact RFI, attn Luca Lancieri, Rome, email l.lancieri@rfi.it. Visit https://www.rfi.it/it/ and https://rde.it/en/. Ref.n. DAC.0092.2022. 38/22.
RFI have awarded to the Joint Venture Rizzani de Eccher (leader), Manelli Impresa and Sacaim the EUR588 million contract for the design and construction of the Dittaino - Catenanuova section (Lot 5) on the Palermo - Catania railway, including the new Catenanuova station and the new alignment 7 km of viaducts and 2.3 km of tunnels. Contact RFI, attn Luca Lancieri, Rome, email l.lancieri@rfi.it. Visit https://www.rfi.it/it/ and https://rde.it/en/. Ref.n. DAC.0092.2022. 38/22.
RFI awarded to the Joint Venture Rizzani de Eccher (leader), Manelli Impresa and Sacaim the EUR588 million contract for the design and construction of the Dittaino - Catenanuova section (Lot 5) on the Palermo - Catania railway, including the new Catenanuova station and the new alignment 7 km of viaducts and 2.3 km of tunnels. Contact RFI, attn Luca Lancieri, Rome, email l.lancieri@rfi.it. Visit https://www.rfi.it/it/ and https://rde.it/en/. Ref.n. DAC.0092.2022. 38/22.
Rete Ferroviaria Italiana (Gruppo FS Italiane) awarded to the Joint Venture Webuild Italia (70%) and Impresa Pizzarotti (30%) the EUR 616million contract for the design and construction of the Nuova Enna – Dittaino section (Lot 4B) on the Palermo - Catania railway, including 3 tunnels, total length 8.5 km and a 1km viaduct. Contact RFI, attn Luca Lancieri, Rome, email l.lancieri@rfi.it. Visit https://www.rfi.it/ and https://www.webuildgroup.com/en. Ref.n. DAC.0091.2022. 43/22.
The consortium Webuild (leader), SELI Overseas (Webuild Group), Ghella and TunnelPro (Ghella Group) secured the EUR 1.2 bn contract to develop Lot 4A between the stations of Caltanissetta Xirbi and Nuova Enna as part of the development of a high-capacity railway along the Palermo-Catania axis in Sicily, Italy. Commissioned by Rete Ferroviaria Italiana (RFI) of Gruppo FS Italiane and financed by the National Recovery and Resilience Plan (PNRR in Italian), the contract involves the executive design and construction of a 27 km new rail line next to the existing one, with 20 km of tunnels - 90% of which excavated by TBMs -, 3 km of viaducts and the upgrading of Caltanissetta Xirbi station
Visit https://www.fsitaliane.it, https://www.rfi.it/it, https://www.webuildgroup.com/en/ and https://www.ghella.com/en. 19/23.
Italy,
Lombardy/Veneto
- it/264
High Speed Railway
Closing Date:
04.10.2019 (Tender Closed)
Open invitation to tender, deadline 04.10.2019, for
construction works on the section between km 115+990.00 - km 120+772 of the new
Brescia East-Verona high speed railway line (Lot 1), including the bitube
mono-track Lonato del Garda tunnel. Consolidation works are included. For bid
documents click here
The value of the contract is EUR204.98 million, excluding
VAT. The duration of the contract is 1090 days.
Contact Consorzio Eni per l'Alta velocità, att.ne Ing.
Tommaso Taranta, Milano, tel +39 3556401, email consorziocepavdue@pec.saipem.com. For further bid docs click here Ref. 7479739. 31/19.
Open invitation to tender, deadline 05/11/2019, for
construction works on the km 140+091- km 148+400 section, excluding from km
144+900 to km 145+800, of the new Brescia East-Verona high speed railway line,
Lot 1, Contract 7- San Giorgio in Salici. The contract includes the
construction of railway embankments, 2 railway trenches, 2 polycentric railway
artificial tunnels, 1 polycentric railway rock tunnel and related completion and/or
interferent works. For bid documents click here
The value of the contract is EUR 147.17 million, excluding
VAT. The duration of the contract is 1076 days. Contact Cepav due Consorzio Eni
per l'Alta velocità, attn Eng. Tommaso Taranta, Milan, tel +39 3556401, email
consorziocepavdue@pec.saipem.com. For more bid documents click here . Ref. 7512340. 38/19.
Postponed from 04/10/2019 to 19/10/2019 the deadline of the open invitation to tender for construction works on the section between km 115+990.00 - km 120+772 of the new Brescia East-Verona high speed railway line (Lot 1), including the twin tube mono-track and Lonato del Garda tunnel.
Consolidation works are included. For bid documents click here
The value of the contract is EUR204.98 million, excluding VAT. The duration of the contract is 1090 days. Contact Consorzio Eni per l'Alta velocità, att.ne Ing. Tommaso Taranta, Milano, tel +39 3556401, email consorziocepavdue@pec.saipem.com. For further bid documents click here.
Ref. 7479739. 39/19.
For further information on any tenders for the EUR 205 million tender published by Cepav Due Consortium for construction and consolidation works of the twin tube mono-track Lonato del Garda tunnel on the section between km 115+990.00 - km 120+772 of the new Brescia East-Verona high speed railway line (Lot 1).
Contact Consorzio Eni per l'Alta velocità, att.ne Ing. Tommaso Taranta, Milano, tel +39 3556401, email consorziocepavdue@pec.saipem.com. For the tender documents please click here and here.
Ref. 7479739. 43/19.
Open invitation to tender, deadline 19/12/2019, for construction works on the section between km 132+923 – km134+552 of the new Brescia East-Verona high speed railway line (Bid 5 - Frassino Est-Mano di Ferro). Will include two cut & cover tunnels, 1 rock tunnel and completion works. For bid documents please click here.
The value of the contract is EUR57.20 million, excluding VAT, 6.34 million of which is part of the OG4 category. The duration of the contract is 1025 days. Contact Cepav Due - Consorzio Eni per l'Alta velocità, attn Eng. Tommaso Taranta, Milano, tel +39 3556401, email consorziocepavdue@pec.saipem.com. For further tender documents click here. Ref. 7556924. 44/19.
NOT AWARDED - The contract 5 Frassino Est-Mano di Ferro, value EUR57.20 million, excluding VAT, for construction works on the section between km 132+923 – km134+552 of the new Brescia East-Verona high speed railway line has not been awarded. Contact Cepav Due - Consorzio Eni per l'Alta velocità, attn Eng. Tommaso Taranta, Milano, tel +39 030 3556401, email consorziocepavdue@pec.saipem.com. For tender information please click here Ref. 7556924. 03/20.
The contract for construction works on the km 140+091- km 148+400 section, excluding from km 144+900 to km 145+800, of the new Brescia East-Verona high speed railway line, Lot 1, Contract 7- San Giorgio in Salici is not awarded, no tenders or requests to participate were received or all were rejected. Contact Cepav due Consorzio Eni per l'Alta velocità, attn Eng.Tommaso Taranta, Milan, tel +39 3556401, email consorziocepavdue@pec.saipem.com. For tender information please click here. Ref. 7512340. 12/20.
Seli Overseas SpA secured the contract for construction works on the section between km 115+990.00 - km 120+772 of the new Brescia East-Verona high speed railway line, including the bitube mono-track Lonato del Garda tunnel (Contract 2). Strengthening works are included. Contact Cepav Due - Consorzio Eni per l'Alta velocità, attn Eng Tommaso Taranta, Milano, tel +39 030 3556401, email consorziocepavdue@pec.saipem.com. For further tender information please click here. Ref. 7595109. 19/20.
Open invitation to tender, deadline 06/08/2020, for construction works on the km 121+401 - km 126+963 section of the new Brescia East-Verona high speed railway line, Lot 1, Contract 3 - Lonato East and Sirmione. The value of the contract is EUR78.55 million, excluding VAT. The duration of the contract is 1040 days. For tender documents please click here and here . Contact Cepav due Consorzio Eni per l'Alta velocità, attn Eng. Tommaso Taranta, Milan, tel +39 3556401, email consorziocepavdue@pec.saipem.com. Ref. 7774096. 24/20.
Open invitation to tender, deadline 12/11/2020, for construction works on the km 105+384 – km 115+880 section (not included km114+565-km114+585 and km 115+821-km115+880 sections)of the new Brescia East-Verona high speed railway line, Contract 1 IC Brescia East, Calcinato and Lonato West. The value of the contract is EUR146.40 million, excluding VAT. The duration of the contract is 950 days. For tender documents please click here, here and here . Contact Cepav due Consorzio Eni per l'Alta velocità, attn Eng. Tommaso Taranta, Milan, tel +39 3556401, email consorziocepavdue@pec.saipem.com. Ref. 7835361. 40/20.
Seli Overseas SpA secured the contract for construction works on the section between km 115+990.00 - km 120+772 of the new Brescia East-Verona high speed railway line, including the bitube mono-track Lonato del Garda tunnel (Contract 2). Strengthening works are included. Contact Cepav Due - Consorzio Eni per l'Alta velocità, attn Eng Tommaso Taranta, Milano, tel +39 030 3556401, email consorziocepavdue@pec.saipem.com. For further tender information please click here and here. Ref. 7595109. 19/20.
Open invitation to tender, deadline 20/02/2020, for construction works on the section between km 127+343 and km 132+923 of the new Brescia East-Verona high speed railway line (Contract 4 - Lugana – Frassino Ovest). For bid documents https://gareeuropeecepavdue.pro-q.it//. The value of the contract is EUR109.58million, excluding VAT. The duration of the contract is 935 days. Contact Cepav Due - Consorzio Eni per l'Alta velocità, attn Eng. Tommaso Taranta, Milano, tel +39 030 3556401, email consorziocepavdue@pec.saipem.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=611676-2019 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=018798-2020. Ref. 7607498. 03/20.
The Joint Venture Research Consorzio Stabile Scarl (Naples), Aicom Srl (Monopoli) and Manelli Impresa (Monopoli) secured the EUR 106.10 million contract, excluding VAT, for construction works on the section between km 127+343 and km 132+923 of the new Brescia East-Verona high speed railway line (Contract 4 - Lugana – Frassino Ovest). Contact Cepav Due - Consorzio Eni per l'Alta velocità, attn Eng. Tommaso Taranta, San Donato Milanese (MI), email consorziocepavdue@pec.saipem.com. For further on the tender, please click here. Ref. 7744377. 05/21.
The Joint Venture Conpat scarl from Rome, composed of Cosedil SpA (Rome) and Consorzio Ciro Menotti soc. coop. pA (Ravenna) secured the EUR 140.83 million contract, excluding VAT, for construction works between the km 105+384 – km 115+880 section (not included km114+565-km114+585 and km 115+821-km115+880 sections) of the new Brescia East-Verona high speed railway line, Contract 1 IC Brescia East, Calcinato and Lonato West. Contact Cepav due Consorzio Eni per l'Alta velocità, attn Eng. Tommaso Taranta, San Donato Milanese (MI), tel +39 3556401, email consorziocepavdue@pec.saipem.com. For further on TED tender, please click here. Ref. 7835361. 29/21.
Italy,
Ligura
- it/263
Aqueduct
Closing Date:
18.03.2019 (Tender Closed)
Open invitation to tender, deadline 18.03.2019, for
architecture and engineering services related to the replacement and rationalization
of large water supplies in the Genoa area.
The contract is composed of 6 lots. The value of the contract is EUR2.21
million, excluding VAT. For bid documents
https://portaleacquisti.gruppoiren.it
where offers must be sent. Contact IREN Spa, Torino, email appalti_aa@gruppoiren.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=079800-2019.
Ref.n. Tender_3083. 08/19.
Awarded the following 6 contracts for 6 lots for
architecture and engineering services related to the replacement and
rationalization of large water supplies in the Genoa area with a total amount
EUR1.16, excluding VAT.
• Lot 1,
RTI Lotti Ingegneria Spa (Rome)/PROG.IN Srl (Rome), value EUR236 970,91
excluding VAT;
• Lot 2,
RTI VAMS Ingegneria Srl (Rome)/SWS Engineering Spa (Trento)/HUB Engineering
Consorzio Stabile Scarl (Rome)/Ing. Paolo Minucci Bencivenga (Naples)/Dott.
Geol. Andrea Valente Arnaldi (Turin), value EUR137,584.60, excluding VAT;
• Lot 3,
RTI Studio di Ingegneria Isola Boasso & Associati Srl (Vercelli)/Idrostudi
Srl (Trieste)/Franco Montaldo (Genoa)/AR/S Archeosistemi SC (Reggio Emilia),
value EUR112,820.24, excluding VAT;
• Lot 4,
RTI Ingegneria 2P & Associati Srl (San Donà di Piave)/HMR Ambiente Srl
(Padova)/HMR Srl (Padova)/Geologia Tecnica Sas di Vorlicek Pier-Andrea &
C.(Este), value EUR250,566.01 excluding VAT;
• Lot 5,
RTI ITEC Engineering Srl (Sarzana)/DBA Progetti Spa (Santo Stefano di
Cadore)/Luciano Minetti (Santa Margherita Ligure), value EUR63,387.46,
excluding VAT;
• Lot 6,
Hydrodata Spa (Turin)/Associazione Professionale HYM Studio
(Turin), value EUR360,000.63, excluding VAT.
Contact IREN Spa, Turin, email appalti_aa@gruppoiren.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=363049-2019.
Ref.n. Tender_3083. 32/19.
Italy,
Trentino Alto Adige
- it/261
Road
Closing Date:
15.10.2020 (Tender Closed)
Open invitation to tender, deadline 15/10/2020, for the supply of technological equipment on the Castelbello e Colsano ring road, SS38 section from km 176,50 to km 179,40 (Lot 2), including a 2494 m tunnel. Value of the contract is EUR10.69 million, excluding VAT. Duration contract 270 days. For further information on the tender please click here, here and here. Contact Agenzia per i procedimenti e la vigilanza in materia di contratti pubblici di lavori, servizi e forniture, Bolzano, attne Stazione Unica Appaltante lavori (SUAL), tel +39 0471414030, email acp.lav@provincia.bz.it. Ref.n. AOV/SUA L 13/2020. 41/20.
The JV E.ma.pri.ce/Passeierbau at San Martino in Passiria secured the EUR44.53 million contract for the Castelbello and Colsano ring road, SS 38 Stelvio from km 176,50 to km 179,40 (Lot 1), including a new tunnel(2.495 m) with 4 safety exits (each 500 m). Duration contract 1.460 days. Contact Agenzia per i procedimenti e la vigilanza in materia di contratti pubblici di lavori, servizi e forniture, Bolzano, attn Stazione Unica Appaltante lavori (SUAL), tel +39 0471414030, fax +39 0471414009, email agenturauftraege@provinz.bz.it. Visit https://www.bandi-altoadige.it/sourcing/awards/resume/id/475085/idL/1and http://www.provincia.bz.it/news/it/news.asp?news_action=4&news_article_id=615424. Ref.n. AOV/SUA L 014/2017. 27/18.
Open invitation to tender, deadline 24.11.2017, for the construction of the Castelbello and Colsano ring road on SS 38 Stelvio (km 176,50 -179,40), Lot 1. The ring road is 3.36 km long and includes a 2.5km tunnel. Value contract EUR50.39 million, excluding VAT. Duration contract 1460 days. ContactAgenzia per i procedimenti e la vigilanza in materia di contratti pubblici di lavori, servizi e forniture, Bolzano, attn Stazione Unica Appaltante lavori (SUAL), tel +39 0471414030, fax +39 0471414009, email agenturauftraege@provinz.bz.it. Visithttps://www.bandi-altoadige.it/sourcing/tenders/resume/id/475085andhttp://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=341098-2017. Ref.n. AOV/SUA L 014/2017. 37/17.
S.I.E.I. Società Impianti Elettrici Industriali Srl from Vicenza have secured the EUR 7.5 million contract, excluding VAT. for the supply of technological equipment on the Castelbello e Colsano ring road, SS38 section from km 176,50 to km 179,40 (Lot 2), including a 2494 m tunnel. Contact Agenzia per i contratti pubblici, attn Stazione Unica Appaltante lavori (SUAL), Bolzano, tel +39 0471414030, email acp.lav@provincia.bz.it. Visit https://ted.europa.eu/en/notice/-/detail/334009-2024. Ref.n. AOV/SUA L 13/2020. 25/24.
Italy,
Liguria
- it/259
Motorways
Closing Date:
26.04.2018 (Tender Closed)
Call for expressions of interest, deadline 26.04.2018, for
the open procedure for the design, supply, commissioning, factory pre-assembly
and testing of 2 Hydroshield model TBMs with associated transport and
excavation material separation facilities to be used for the excavation of
Monterosso natural tunnels (6,2 km), Amandola (6 km) and Borgonuovo (2.2 km).
This is part of the project to upgrade the A7-A10-A12 road and motorway system
- Genoa Node ( Gronda di Genova). Contact Autostrade per l'Italia Spa, Rome,
email logistica@pec.autostrade.it.
Please go to https://autostrade.bravosolution.com/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=5541&oppList=CURRENT
. Ref. no. Tender_21014. 16/18.
Restricted procedure, deadline 27.04.2018, for the works
management (DL) and safety coordinator (CSE) services for the Gronda di Genova,
project, Lot 5. Contract value €6.40 million, excluding VAT. Contract duration
60 months. Contact Autostrade per l'Italia Spa, Rome, email
logistica@pec.autostrade.it. Go to http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=130439-2018
, OJ S 059 and https://autostrade.bravosolution.com/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=5461&oppList=CURRENT
. Ref. no. Tender_20128. 16/18.
Restricted procedure, deadline 21.05.2018, for the upgrading of A7-A10-A12 (Gronda di Genova) system, Lot 5, sea work termination. The filling box will be built in the channel between the Cristoforo Colombo airport runway and the breakwater and will be used to collect the resulting materials from the excavation of the Gronda tunnels. Contract value 136.52 million Euro excluding VAT. Contract duration 1611 days after the award. Contact Autostrade per l'Italia SpA, att.ne Ing. Alberto Selleri, Rome, tel +39 0643632307, fax +39 0643634206, email gareappalti@autostrade.it. Go to
https://www5.autostrade.it/applica/gare/gareapp.nsf/vwBDDT/BCB73FF4225AD013C1258256005C0374?opendocument&initPos=3&lang=IT&Lavori
, http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=109240-2018 , OJ S 049, http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=124799-2018 , OJ S 056 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=165711-2018, OJ S 074. Contract Code 0266/Network, Order 0G805. 16/18.
Competitive dialogue, deadline 31.07.2019, for the supply,
design, installation, pre-assembling on site, test and commissioning of the
muck operation and transport system to be used during excavation of tunnels,
part of the project to upgrade the A7-A10-A12 road and motorway system - Genoa
Node ( Gronda di Genova). Contract value EUR146.99 million, excluding VAT.
Duration contract 102 months. Contact Autostrade per l'Italia Spa, Rome, email logistica@pec.autostrade.it.
Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=284331-2019.
26/19.
Postponed from 31/07/2019 to 30/09/2019 the deadline of the
competitive dialogue for the supply, design, installation, pre-assembling on
site, test and commissioning of the muck operation and transport system to be
used during excavation of tunnels, part of the project to upgrade the A7-A10-A12
road and motorway system - Genoa Node ( Gronda di Genova).
Contract value is EUR146.99 million, excluding VAT. Duration
of the contract will be 102 months. Contact Autostrade per l'Italia Spa, Rome,
email logistica@pec.autostrade.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=354680-2019.
31/19.
Competitive dialogue, deadline 30/09/2019, for the design,
supply, commissioning, factory pre-assembly and testing of 2 Hydroshield model
TBMs to be used for the excavation of Monterosso natural tunnels (6,2 km),
Amandola (6 km) and Borgonuovo (2.2 km). This is part of the project to upgrade
the A7-A10-A12 road and motorway system - Genoa Node ( Gronda di Genova).
Contact Autostrade per l'Italia Spa, Rome, email logistica@pec.autostrade.it. Value of the contract is EUR303.96 million, excluding
VAT. Duration of the contract 2953 days. For bid documents https://autostrade.bravosolution.com. Contact Autostrade per l'Italia Spa,
Rome, email logistica@pec.autostrade.it. Visit
http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=357164-2019
and
http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=284405-2019.
35/19.
https://autostrade.bravosolution.com
https://autostrade.bravosolution.com/esop/toolkit/opportunity/opportunityDetail.do?opportunityId=8039&oppList=CURRENT
Postponed from 30/09/2019 to 31/10/2019 the deadline of the competitive dialogue for the supply, design, installation, pre-assembling on site, test and commissioning of the muck operation and transport system to be used during excavation of tunnels, part of the project to upgrade the A7-A10-A12 road and motorway system - Genoa Node ( Gronda di Genova).
Contract value EUR146.99 million excluding VAT. Duration of the contract will be 102 months. Contact Autostrade per l'Italia Spa, Rome, email logistica@pec.autostrade.it. For bid documents click here . 40/19.
The restricted procedure, deadline 27/04/2018, for the works management (DL) and safety coordinator (CSE) services for the Gronda di Genova, project (Lot 5) has been cancelled, due to contracted activities being redefined and will be therefore be included in a new contract. Contact Autostrade per l'Italia Spa, Rome, email logistica@pec.autostrade.it. For bid/tender documents please click here. Ref. no. Tender_20128. 42/19.
Restricted procedure, deadline 10/12/2019, for the works management (DL) and safety coordinator (CSE) services for the Gronda di Genova project.
Contract value EUR121.27 million, excluding VAT. The contract is composed of 5 lots. Contact Autostrade per l'Italia Spa, Rome, email logistica@pec.autostrade.it. For further bid/tender documents click here. Ref. no. Tender_20128. 42/19.
Postponed from 30/09/2019 to 31/10/2019 the deadline of the competitive dialogue for the design, supply, commissioning, factory pre-assembly and testing of 2 Hydroshield model TBMs to be used for the excavation of Monterosso natural tunnels (6.2 km), Amandola (6 km) and Borgonuovo (2.2 km). This is part of the project to upgrade the A7-A10-A12 road and motorway system - Genoa Node (Gronda di Genova). Contact Autostrade per l'Italia Spa, Rome, email logistica@pec.autostrade.it. The value of the contract is EUR303.96 million, excluding VAT. Duration of the contract will be 2953 days. For bid/ tender documents click here and here. Contact Autostrade per l'Italia Spa, Rome, email logistica@pec.autostrade.it. .42/19.
Postponed from 31/10/2019 to 21/11/2019 the deadline of the competitive
dialogue for the supply, design, installation, pre-assembling on site,
test and commissioning of the muck operation and transport system to be
used during excavation of tunnels, part of the project to upgrade the
A7-A10-A12 road and motorway system - Genoa Node ( Gronda di Genova).
Contract value EUR146.99 million excluding VAT. Duration of the contract
will be 102 months. Contact Autostrade per l'Italia Spa, Rome, email
logistica@pec.autostrade.it. Visit
http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=519990-2019.
45/19.
Postponed from 31/10/2019 to 21/11/2019 the deadline of the competitive
dialogue for the supply, design, installation, pre-assembling on site,
test and commissioning of the muck operation and transport system to be
used during excavation of tunnels, part of the project to upgrade the
A7-A10-A12 road and motorway system - Genoa Node ( Gronda di Genova).
Contract value EUR146.99 million excluding VAT. Duration of the contract
will be 102 months. Contact Autostrade per l'Italia Spa, Rome, email
logistica@pec.autostrade.it. Visit
http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=519990-2019.
45/19.
Postponed from 10/12/2019 to 17/01/2020 the deadline of the restricted procedure to tender for the works management (DL) and safety coordinator (CSE) services for the Gronda di Genova project.
The contract value is EUR121.27 million, excluding VAT. The contract is composed of 5 lots. For bid/tender documents https://autostrade.bravosolution.com and also click here.
Contact Autostrade per l'Italia Spa, Rome, email logistica@pec.autostrade.it.
47/19.
The competitive dialogue for the supply, design, installation, pre-assembling on site, test and commissioning of the muck operation and transport system to be used during excavation of tunnels, part of the project to upgrade the A7-A10-A12 road and motorway system - Genoa Node ( Gronda di Genova) has been revoked. The value of the contract is EUR146.99 million excluding VAT. Contact Autostrade per l'Italia Spa, Rome, email logistica@pec.autostrade.it. For further tender information please click here.
30/20.
Open invitation to tender, deadline 26/03/2021, for the external manager for the safety for all tunnels by D.L. n. 264/2006 and located on Autostrade per l’Italia motorways, Genoa Department 1: A7- Genova-Serravalle, A12- Genova-Sestri Levante, A10 - Genoa-Savona, A26- of the Genoa Voltri-Gravellona Toce tunnels + branches. Value of the contract EUR 809,200, excluding VAT. Duration of the contract is 24 months. Contact Autostrade per L'Italia SpA, attn Stefania Vignolo, Genoa, tel +39 0104104361, fax +39 0104104400/302, email svignolo@autostrade.it. For further on the tender, please click here. GU S 032. Ref. n. 72ACC/GE/2020. 07/21.
Prior information notice, deadline 25/02/2021, for the for preventive and corrective maintenance and for the supply of spare parts for the Industrie CBI longitudinal fans installed in the tunnels under the responsibility of Direzione di Tronco di Genova di Autostrade per l'Italia SpA. Contact Autostrade per l’Italia SpA, Direzione di tronco di Genova, Genova, tel +39 010 41041. Visit https://autostrade.bravosolution.com. Ref.n. DT1_66ACC/GE/2020. 07/21.
Request for expressions of interest, deadline 22/06/2021, for supply and maintenance of Thermostick’s Fire detection linear systems installed in the tunnels belonging to Departments DT1 Genoa. Value contract EUR 211,098.16. Duration of the contract will be 4 years from award. Contact Autostrade per l’Italia SpA, attn Eng Patrizia Fumarola, Rome. For further on tender, please click here. Ref.n. 27ACC/GE/2021. 24/21.
Open invitation to tender, deadline 26/10/2021, for an external manager for all tunnel safety as part of the D.L. n. 264/2006 located on Autostrade per l’Italia motorways, Genoa Department 1: A7- Genova-Serravalle, A12- Genova-Sestri Levante, A10 - Genoa-Savona, A26- of the Genoa Voltri-Gravellona Toce tunnels + branches in Genoa, Savona, Alessandria, Novara and Verbania provinces). For tender documents, please click here. Value of the contract will be EUR 829,936 Euro, excluding VAT. Duration of the contract will be 24 months. Contact Autostrade per L'Italia SpA, attn Nicola Santeufemia, Genoa, tel +39 0104104363, fax +39 0104104400/302, email nicola.santeufemia@autostrade.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=458257-2021. Ref. n. 72ACC/GE/2021. 38/21.
The contract for the open invitation to tender, deadline 26/03/2021, for the external manager for the safety for all tunnels by D.L. n. 264/2006 and located on Autostrade per l’Italia motorways, Genoa Department 1, was not awarded. Contact Autostrade per L'Italia SpA, attn Nicola Santeufemia, Genoa, tel +39 0104104363, fax +39 0104104400/302, email nicola.santeufemia@autostrade.it. For further on the tender, please click here http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=326388-2021. GU S 032. Ref. n. 72ACC/GE/2020. 26/21.
DBA PRO. SpA from Belluno secured the EUR 85,751.05 Euro contract, excluding VAT, for design engineering services, safety coordination during the design phase and checks for the upgrading of the electrical substations serving the tunnels of the Genoa Department. Contact Autostrade per L'Italia SpA, attn Paolantonio Mazzarella, Rome, email paolantonio.mazzarella@autostrade.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=464284-2021. Ref. n. 72ACC/GE/2021. 38/21.
CBI SERVICE Srl from Milan secured the EUR 470,827.70 contract, excluding VAT, for preventive and corrective maintenance and for the supply of spare parts for the Industrie CBI longitudinal fans installed in the tunnels under the responsibility of Direzione di Tronco di Genova di Autostrade per l'Italia SpA. Contact Autostrade per l’Italia SpA, attn Nicola Santeufemia, Genoa, tel +39 0104104363, fax+39 0104104400/302. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=484277-2021. Ref.n. DT1_66ACC/GE/2020. 38/21.
Lombardi SA Ingegneri Consulenti from Bellinzona-Giubiasco (Switzerland) secured the EUR 805,421.92 contract, excluding VAT, for an external manager for all tunnel safety as part of the D.L. n. 264/2006 located on Autostrade per l’Italia motorways, Genoa Department 1: A7- Genova-Serravalle, A12- Genova-Sestri Levante, A10 - Genoa-Savona, A26- of the Genoa Voltri-Gravellona Toce tunnels + branches in Genoa, Savona, Alessandria, Novara and Verbania provinces). Contact Autostrade per L'Italia SpA, attn Nicola Santeufemia, Genoa, tel +39 0104104363, fax +39 0104104400/302, email nicola.santeufemia@autostrade.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=203207-2022. Ref. n. 72ACC/GE/2021. 17/22.