Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Pakistan

Pakistan, Pehur - pk/12

Flood Canal

Turkish contractor STFA will construct 25 km-long canal with two tunnels of total length 5.5 km. Asian Development Bank funding (83%). Construction period seven years. March 1998.STFA of Turkey using new 8HR2 Häggloader and three reconditioned HRST-115 Shuttlecars for excavation of flood tunnel. Visit www.rockmachines.se Sept 2000.



Permalink

Pakistan, Kohala - pk/11

Hydro

Upstream 14 km from Muzaffarabad. Power tunnels 2 x 9.0 km with 46-80m2 section together with underground powerhouse for proposed 600 MW station. 375 m-long power tunnel to start late-1999. Five-year construction period on 25-year BOT by Synergics Energy Development Inc of United States. Detailed engineering study completed by Norconsult/Norplan. Value $850 million. Contractors wishing to prequalify should contact Azad Jammu & Kashmir Private Power Board, fax +92 581 4014. February 1998.



Permalink

Page: