The SFMTA (San Francisco Municipal Transportation Agency) awarded the EUR33.12 million (USD40.98 million) contract to replace the track structure and perform seismic strengthening and structural repairs in the Twin Peaks Tunnel (3.54 km-2.2 miles)to the Joint Venture of Shimmick/ConQuest. The work will have to be completed within 240 calendar days. Visit https://www.sfmta.com/sites/default/files/reports-and-documents/2018/01/2-6-18_item_14_contract_award_-_twin_peaks_tunnel.pdf. 11/18.