The awarding procedure, deadline 08.08.2016, for the Kaynarca-Pendik-Tuzla Subway Line construction and E&M systems procurement including installation and commissioning, has been discontinued. The total length is 12 km with 8 stations and is on Istanbuls Asian side. Contact Seyrantepe Metro Tesisleri, Seyrantepe SARIYER/Istanbul, att.n Feriha Mert, Director of Asian Side Rail Systems, Istanbul, tel +90 2123126515, fax +90 2124554373, e-mail feriha.mert@ibb.gov.tr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=278237-2016. Ref.n. 2016/252589. 32/16.