Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Switzerland

Switzerland, Gotthard - ch/17

High Speed Railway

The JV TLT-Turbo/ABB, secured the EUR31 million ventilation contract lot C in Gotthard Base Tunnel. The contract includes the design and the development of operational ventilation as well as its realization and installation in Sedrun and Faido multifunction stations. Duration of work: mid-2012 to spring 2014. Visit www.alptransit.ch. 18/11.



Permalink