The JV TLT-Turbo/ABB, secured the EUR31 million ventilation contract lot C in Gotthard Base Tunnel. The contract includes the design and the development of operational ventilation as well as its realization and installation in Sedrun and Faido multifunction stations. Duration of work: mid-2012 to spring 2014. Visit www.alptransit.ch. 18/11.