Marti Tunnelbau AG from Moosseedorf secured the EUR74.63 million
contract,
excluding VAT, for the renewal of tracks and switches in the Loetschberg
tunnel. The contract includes the adaptation of the drainage system.
The duration of the contract from is 02.05.2018 to 31.12.2022. Further
information from
http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1019957 (German)
and/or http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1019965
(French). Contact BLS AG, attn
Silvio Gasparini, Berna, tel +32
583272958, email silvio.gasparini@bls.ch. Visit
http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=206061-2018.
Ref.n. 296. 20/18.