Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Switzerland

Switzerland, Gotthard - ch/17

High Speed Railway

The joint venture EB-GBT, composed of Bruegger HTB GmbH from Frutigen and Implenia from Zurich, secured the EUR3.09 million contract, including 8% VAT, for the cleaning work in the Gotthard Base tunnel, the underground access tunnels and secondary buildings. The duration of the works is from 01.10.2017 to 31.12.2022. Contact SBB, Berna, email einkauf.dienstleistungen@sbb.ch.  Visit http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=982485 and http://www.rsi.ch/news/ticino-e-grigioni-e-insubria/Ecco-chi-pulir%C3%A0-Alptransit-9492637.html. 35/17.



Permalink