DE_B + S AG from Bern secured the EUR1.79 million (CHF1.67million) contract, excluding VAT, for civil engineering experts for the Zimmerberg Base Tunnel 2 (ZBT2). The tunnel is approximately 10.8 km long and consists of two single-track tubes. It connects to the Zimmerberg Base Tunnel 1 and extends to the south portal Litti near Baar. The project is divided into the following areas: Nidelbad, tunnel and Deinikon/Litti. Contact SBB, Zurich, tel +41790000000, email einkauf.bauprojekte.ost@sbb.ch. Visit https://ted.europa.eu/en/notice/-/detail/408548-2025. 26/25.