Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Sweden

Sweden, Stockholm - se/13

Ring Road

BASF MEYCO Fireshield 1350 fire protection mortar was used on this project Contracts awarded to NCC Eeg-Henriksen Anlegg for two twin tunnels on Stockholm ring road, 1,070 m-long at Arsta and 800 m-long at Johanneshov. Nov 1998. $9 million contract for 1.2 km Nobelberget tunnel on Sodralanken southern ring road awarded to Vagverket, the Swedish Roads Administration. August 1999. Vagverket www.vv.se reports Sodra Lanken budget as $800 million. Main tunnels are 3-lane with cross-passages at 100-150 m intervals. NCC contracts SL01 and SL02 are 60% complete with 450,000 cu m of total 750,000 cu m excavated with view to completion January, 2001. Selmer contract SL03 which involves 8.3 km of tunnel varying from 20-126 sq m section and with 8 m to 35 m overburden is 56% complete and will finish end-2001. Work starting on underground bridge at Hammarby end with 35 m span and only 3.5 m cover. Five further bridges required elsewhere. Pregrouting 20-25 m ahead of face with 7 m overlap to avoid leakage that would reduce water table, and 25 dbA night-time and 35 dbA weekend noise restrictions are in force. All rock crushed and recycled. Primary crusher situated underground with conveyor system to harbour for export of surplus rock. Granite is transmitting blast noise 800 m, so residents are warned 30 mins in advance by minicom call. 70 flats have been made available by Vagverket for residents who wish to move out while faces pass beneath their homes. 42,000 grouted rockbolts 3-4 m-long used to date, mainly in roof. Variety of 12 Atlas Copco drillrigs drilling 5 m blastholes and 4 m rockbolt holes. Low-fume slurry explosives loaded using Dyno automatic charging tracks with nonel detonation. Mainly shotctrete finish. Visit www.selmer.no and www.atlascopco.com May 2000. Award of contract for feasibility study for Nynasvagen road tunnel in southern suburbs of Stockholm to Sycon-Stockholm Konsult. Decision and invitation to tender for design expected in 2003. Visit www.stockholmkonsult.se 20/01.Open call for bids, deadline 2nd March, 2004 for project design of the northern link. Section K3 Roslagstull includes approx. 2 x 5 km of four-lane rock tunnels and ramps. Drill/blast method to be used. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=209825-2003, OJ S 235, or contact Vägverket Region Stockholm, Solna, fax +46 86270923. E-mail vagverket.sto@vv.se 51/03.The national road administration has awarded to Sweco VBB a tunnel design contract for the Roslagstull section (contract K3) on the northern link, including approximately 2 x 5 km of four-lane rock tunnels and ramps. Contract value: SEK49.9 million. Visit www.vv.se/vag_traf/vagproj/norralanken/index.shtml and www.sweco.se 31-32/04.Open call for tenders, deadline 22nd August, 2005 for coordinated management for tunnels in rock and soft ground as well as roadworks, as part of the northern link, Stockholm's north ring road between Nortull and Vartan. The total tunnel length is 2 x 11 km, of which 2 x 9 km are rock tunnels and 2 x 2 km are concrete tunnels. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=121718-2005, OJ S 123, or contact Vagverket, Solna, fax +46 86270923. E-mail norralanken@vv.se 29/05.Vagverket has awarded four contracts to Byggstrategi Peter Jonsson, Delken Bygg och Konsult, Nitro Consult and Per Ekengren Markkonsult for coordinated management for tunnels in rock and soft ground as well as roadworks, as part of the northern link, Stockholm's north ring road between Nortull and Vartan. The 2 x 11 km project includes about 2 x 9 km of rock tunnels, about 2 x 2 km of concrete tunnels and a 200 m tunnel in soft ground.Byggkonsult Peter Jonsson and Delken Bygg och Konsult work with the rock tunnels. Nitro Consult with a 200 m soft ground tunnel and Per Ekengren Markkonsult with the concrete tunnels. Visit www.nitroconsult.se 04/06.Open call for tenders, deadline 31st May, 2006 for site supervision related to ground work and ground stabilization during construction of the Northern Link, Stockholm's north ring road including 9 km of blasted tunnel and 2 km of cut-and-cover tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=074488-2006, OJ S 71, or contact Vagverket, Solna, tel. +46 87576994. E-mail anna.nylen@vv.se 19/06.Open call for tenders, deadline 31st May, 2006 for site supervision related to rock work during construction of the Northern Link, Stockholm's north ring road including 9 km of blasted tunnel and 2 km of cut-and-cover tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=074489-2006, OJ S 71, or contact Vagverket, Solna, tel. +46 87576994. E-mail anna.nylen@vv.se 19/06.Open call for tenders, deadline 31st May, 2006 for site supervision related to water and drainage during construction of the Northern Link, Stockholm's north ring road including 9 km of blasted tunnel and 2 km of cut-and-cover tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=074490-2006, OJ S 71, or contact Vagverket, Solna, tel. +46 87576994. E-mail anna.nylen@vv.se 19/06.Open call for tenders, deadline 31st May, 2006 for site supervision related to water and drainage during construction of the Northern Link, Stockholm's north ring road including 9 km of blasted tunnel and 2 km of cut-and-cover tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=074490-2006, OJ S 71, or contact Vagverket, Solna, tel. +46 87576994. E-mail anna.nylen@vv.se 19/06.Open call for tenders, deadline 29th May, 2006 for site supervision related to geotechnics during construction of the Northern Link, Stockholm's north ring road including 9 km of blasted tunnel and 2 km of cut-and-cover tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=082180-2006, OJ S 78, or contact Vagverket, Solna, tel. +46 87576994. E-mail anna.nylen@vv.se 19/06.Open call for tenders, deadline 8th November, 2006 for quality coordination during construction of stockholm's northern ring road, in particular in the tunnels. Click here. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=187721-2006, OJ S 176, or contact Vagverket, Stockholm, tel. +46 771119119. E-mail anna.nylen@vagverket.se 40/06.Open call for tenders, deadline 8th November, 2006 for environmental consultancy to check that contractors comply with environmental policies during construction of Stockholm's northern ring road, in particular in the tunnels. Click here. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=187722-2006, OJ S 176, or contact Vagverket, Stockholm, tel. +46 771119119. E-mail anna.nylen@vagverket.se 40/06.Open call for tenders, deadline 3rd September, 2007 for contract NL 34, Teknikhöjden rock tunnels, as part of the north ring road in Stockholm. Contract NL 34 includes 1,500 metres of one-lane tunnels and 1,000 metres of two-lane tunnels. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=57632-2007, OJ S 47, or contact Vägverket, Stockholm, fax +46 771119119. E-mail norralanken@vv.se 15/07.Open call for tenders, deadline 3rd September, 2007 for contract NL 35, Värtan rock tunnels, as part of the north ring road in Stockholm. Contract NL 35 includes 200 metres of one-lane tunnels, 650 metres of two-lane tunnels, 250 metres of three-lane tunnels and 1,450 metres of four-lane tunnels. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=57633-2007, OJ S 47, or contact Vägverket, Stockholm, fax +46 771119119. E-mail norralanken@vv.se 15/07.Open call for tenders, deadline 3rd September, 2007 for contract NL 33, Albano rock tunnels, as part of the north ring road in Stockholm. Contract NL 33 includes 1,100 metres of one-lane tunnels, 650 metres of two-lane tunnels and 500 metres of three-lane tunnels. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=58839-2007, OJ S 48, or contact Vägverket, Stockholm, fax +46 771119119. E-mail norralanken@vv.se 15/07.The Norra Länken tunnels are twin tubes. One-lane tunnels have a cross section of 9 m x 10 m (height x width). Two-lane tunnels have a cross section of 9 m x 13 m. Three-lane tunnels have a cross section of 9.5 m x 16.5 m. Four-lane tunnels have a cross section of 10 m x 18.5 m. Read E-News Weekly 14/2007. 15/07.Open procedure, deadline 21st May, 2007 for inspection for the northern link, Stockholm's north ring road. The tender is for inspection organisation to handle all the inspections for the major contracts. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=77278-2007, OJ S 63, or contact Vägverket, Stockholm, tel. +46 771119119. E-mail lars.lilja@vv.se 17/07.Veidekke has been awarded two contracts for two tunnels and access ramps on the Norra Länken (Northern Link), Stockholm's north ring road, by the Swedish public roads administration. These contracts are worth a total of just under SEK1 billion. Contract NL 33 is for the Albano rock tunnels, including 1.1 km of one-lane tunnels, 650 metres of two-lane tunnels and 500 metres of three-lane tunnels. The Albano rock tunnel will require approx. the blasting of 250,000 cubic metres of rock. Contract NL 34 refers to the Teknikhöjden rock tunnels, including 1.5 km of one-lane tunnels and 1,000 metres of two-lane tunnels. The Teknikhöjden rock tunnel will need to blast approx. 300,000 cubic metres of rock. Veidekke previously built the two working tunnels for these tunnels. The work includes jet grouting and shotcreting, construction of concrete bridges and other concrete structures underground, and road construction. Visit www.veidekke.se 05/08.Oden Anläggning in a 50/50 joint venture with Hochtief bagged contract NL 35 for the Värtan rock tunnels. The assignment includes 200 metres of one-lane tunnels, 650 metres of two-lane tunnels, 250 metres of three-lane tunnels and 1,450 metres of four-lane tunnels. The tunnels will require to move approx. 400,000 cubic metres of rock. The same JV also won contract NL 51 for the Värtan concrete tunnel. Read E-News Weekly 5/2008. The two contracts are worth SEK1.2 million. See also E-News Weekly 1/2008 for the announcement of contract NL 11. Visit www.oden.nu, www.hochtief-construction.de and www.vv.se/templates/page3____19625.aspx 05/08.



Permalink