Itinera Spa secured the EUR135 million (SEK1.3bn) contract for the underground construction of the Arenastaden - Södra Hagalund section of the new Stockholm Yellow Line being built from Arenastaden to Odenplan, where it will connect to the existing Green Line to the south. The contract includes two stations (Arenastaden and Södra Hagalund) and a 2.5km tunnel, mainly in the Solna municipality. Duration of the works is 53 months. Visit https://www.itinera-spa.it/ and https://nyatunnelbanan.se/en/awarded-contract. 10/22.