Infrakraft Sverige AB from Karlstand secured the EUR247.61 million (SEK2.75 bn) contract, excluding VAT, for the construction of the new 14 km railway section between Hallsberg and Stenkumla, including 12 bridges and a 2.4 km long bi-tube single track tunnel. Contact Trafikverket Myndighet, Borlange, attn Johan Sundin, tel +46 73-701 55 76, email johan.sundin@trafikverket.se. Visit https://ted.europa.eu/en/notice/-/detail/85011-2025. Rif.n. KOM-409030. 06/25.