Three lots have been secured for the contracts for the emergency works on the Madrid-Levante High Speed line as a result of the DANA storm of October 29, 2024.
- Acciona Construccion SA from Madrid, Lot 1 - from Albacete km 248+102 to tunnel de Chiva km364+800, repair of the infrastructure, superstructure and auxiliary facilities, value EUR3.73 million, excluding VAT.
- Rover Rail SA from Madrid, Lot2 – from tunnel de Chiva km 364+800 to Valencia km 397+258, repair of the infrastructure, superstructure and auxiliary facilities, value EUR7.33 million, excluding VAT.
- Siemens Rail Automation SA from Tres Cantos, Lot 3 - from Albacete to Valencia, repair works on the signalilng and communications facilities, value EUR2.40 million, excluding VAT.