Breakthrough reported on 5th October one month ahead of schedule after last blast on 2.4-km La Cumbre tunnel on east to west road TF-812 between Santa Cruz de La Palma and Los Llanos de Aridane on Isle of La Palma. Total cost around Ptas4.2 billion. Visit www.gobcan.es 42/01.Open call for bids, deadline 7th April, 2006 for design and construction of the road connection to Fonsalia harbour on the new road Adeje-Santiago del Teide. The project includes a bidirectional single bored tunnel, 1.4 km in length with three lanes. The roadway width will be about 12 m. It is planned to be constructed using the drill/blast method in top heading / bench sequence, with the help of a roadheader. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=05453-2006, OJ S 5, or contact Canary autonomous region, Santa Cruz de Tenerife, fax +34 922475088. 07/06.A JV of Ferrovial Agroman, Mejias y Rodriguez, Construcciones Darias, Gomasper, and VVO Construcciones secured a EUR167.6 million contract to design and construct the road connection to Fonsalia harbour on the new road Adeje-Santiago del Teide. The project includes a bidirectional single bored tunnel, 1.4 km in length with three lanes. Click es/64 for more. Visit www.ferrovial.es and www.construccionesdarias.com 43/06.Applus Norcontrol and Tecamac received a EUR2.2 million contract for on-site supervision and work control for the road connection to Fonsalia harbour on the new road Adeje-Santiago del Teide, including a 1.4 m-long three-lane bidirectional single bored tunnel. Visit www.appluscorp.com 16/07.