Following spectacular success with current phase of expansion in which some 35 km of underground lines with 33 stations and 20 km surface line with 4 stations were constructed and commissioned in a four year span, Pta 128,400 million set aside to finance building of metro line to south of Madrid taking in the suburbs of Alcorcon, Leganes, Getafe, Mostoles and Fuenlabrada. 35.2 km tunnels with 29 stations. Construction will not commence until after July, 1999 elections and will then be completed within four years. February 1999.
Extension of Line 8 to Barajas airport completed using NFM TBM. June 1999.
FCC contracted to tunnel 1.3 km by traditional method to Valdelasfuentes station and onward 1.7 km to Avenida de Espana using NFM TBM. August 1999.
Extension of Line 1 for 3.2 km to Vallegas with 3 new stations for 2004 opening likely to be next award at $75 million. August 1999.
6 km extension of Barajas airport line from Mar de Cristal to Nuevos Ministerios connecting with Cercanias RENFE station and interchanging with Lines 6 and 10 of the metro. Travel time from downtown Madrid to airport will be 12 minutes. Work starts November, 1999 for commissioning October, 2001. Two EPBs will be employed. August 1999. www.comadrid.es/cmadrid/metro
Comunidad de Madrid announced contract award for 6.5 km Line 8 connection to the airport from downtown Nuevos Ministerios to jv of ACS-Necso-Ferrovial in value $160 million using two EPB TBMs already in ownership. Two stations, one of which is a major interchange. Visit www.grupoacs.com December 1999.
Herrenknecht 9.38 m TBM will commence 3.5 km drive on line 8 extension from shaft presently under construction at Mar de Cristal station to terminate at shaft to be constructed alongside M-30 ring road. From here conventional tunnelling will be used. Colombia station at approximately halfway position will form interchange with line 9. Visit www.necso.es and www.ferrovial.es for more details. February 2000.
FCC/Necso/ACS jv awarded $23 million contract to construct 1.3 km of line 9 of Madrid metro at Riva in an 8 m-deep cut-and-cover trench in eight months. Financed by Tres Cantos, a state-owned enterprise. The contract also includes extensions to the train depot and building of a new electricity substation. Visit www.necso.es June 2000.
Herrenknecht 9.38 m-diameter EPB under erection in start shaft at Mar De Cristal in readiness for Line 8 extension drive commencing 21st August. There are currently 37 slurry wall machines at work on this line. Visit www.comadrid.es/cmadrid/metro July 2000.
Dragados Lovat 7.4 m EPB underway on line 10 extension south to connect with Metrosur achieving up to 36 x 1.2 m rings/day having placed 346 rings in 18 days to 11th November. Visit www.dragados.es and www.lovat.com November 2000.
9.38 m-diameter NFM EPB Adelantada, working for FCC on Line 10 extension, has completed 939 m of tunnel in 31 days to 20th February, 2001. This is claimed as a world record advance for EPBs. Visit www.fcc.es Also, Lovat 7.4 m-diameter EPB on line 10 built 41 x 1.2 m rings, advancing 49 m in 24 h on 20th February, 2001. Visit www.dragados.com and www.comadrid.es/cmadrid/metro 09/01.Tunnel linking Mar de Cristal, Colombia and Nuevos Ministerios on Line 8 reported completed by jv Necso-ACS-Ferrovial. Direct connection from Paseo de la Castellana to the Barajas airport to open in March, 2002. 50/01.Dragados also reported that 7.4 m-diameter Lovat TBM 'Cibeles' has reached Alcorcí³n on Line 10 extension to Metrosur circle Line 12. Average speed of 19.6 metres a day with record daily speed of 51.6 metres and a highest monthly speed of one kilometre in October, 2001. Cost of €86 million. Construction underway at stations in Casa de Campo, Colonia Jardín, Cuatro Vientos, Alcalde Joaquín Vilumbrales, and Puerta del Sur. Opening at spring, 2003. Visit www.comadrid.es/cmadrid/metro 50/01.Open call for bids, deadline 2nd February, 2004 for design of the La Castellana extension of the metro. Tender budget: €1.2 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=214915-2003, OJ S 241, or contact Mintra, Alcorcí³n, fax +34 914880598 or 914111724. Visit www.comadrid.es/012 02/04.Open call for bids, deadline 2nd February, 2004, for design of Line 1 extension to Chamartín and Hortaleza. Tender budget: €1.7 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=214916-2003, OJ S 241, or contact Mintra, Alcorcí³n, fax +34 914880598 or 914111724. Visit www.comadrid.es/012 02/04.Open call for bids, deadline 2nd February, 2004, for design of Line 3 extension to Villaverde (5.4 km with six stations). Tender budget: €1.8 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=214919-2003, OJ S 241, or contact Mintra, Alcorcí³n, fax +34 914880598 or 914111724. Visit www.comadrid.es/012 02/04.Open call for bids, deadline 2nd February, 2004, for design of the new Pinar del Rey station on Line 8. Tender budget: €516,000. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=214920-2003, OJ S 241, or contact Mintra, Alcorcí³n, fax +34 914880598 or 914111724. Visit www.comadrid.es/012 02/04.Open call for bids, deadline 2nd February, 2004, for design of Line 11 extension to Caravanchel Alto (1.6 km with two stations). Tender budget: €830,000. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=214926-2003, OJ S 241, or contact Mintra, Alcorcí³n, fax +34 914880598 or 914111724. Visit www.comadrid.es/012 02/04.Open call for bids, deadline 2nd February, 2004, for design of Line 2 extension to La Elipa (1.2 km with one station). Tender budget: €700,000. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=214928-2003, OJ S 241, or contact Mintra, Alcorcí³n, fax +34 914880598 or 914111724. Visit www.comadrid.es/012 02/04.Open call for bids, deadline 2nd February, 2004, for design of the new Bolívar station on Line 6. Tender budget: €516,000. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=214929-2003, OJ S 241, or contact Mintra, Alcorcí³n, fax +34 914880598 or 914111724. Visit www.comadrid.es/012 02/04.Open call for bids, deadline 2nd February, 2004, for design of Line 5 extension to Alameda de Osuna (2 km with two stations). Tender budget: €830,000. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=214930-2003, OJ S 241, or contact Mintra, Alcorcí³n, fax +34 914880598 or 914111724. Visit www.comadrid.es/012 02/04.Open call for bids, deadline 11th February, 2004 for design of Line 4 extension to San Chinarro and Las Tablas (3.8 km with four stations). Tender budget: 1.3 million euros. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=001460-2004, OJ S 2, or contact Mintra, Alcorcí³n, fax +34 914880598 or 914111724. Visit www.comadrid.es/012 03/04.Open call for bids, deadline 15th March, 2004 for quality control and inspections during construction of the new Aviacií³n Espaí±ola station on Line 10. Tender values: EUR106,300 and EUR1.8 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=020317-2004 and http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=020319-2004, OJ S 23, or contact Mintra, Alcorcí³n, fax +34 4880598 or 4111724. 07/04.Open call for bids, deadline 15th March, 2004 for quality control and inspections during construction of Line 1 extension to Ensanche de Vallecas. Tender values: EUR804,100 and EUR2.3 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=020320-2004, OJ S 23, and http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=021275-2004, OJ S 24, or contact Mintra, Alcorcí³n, fax +34 4880598 or 4111724. 07/04.Open call for bids, deadline 22nd March, 2004 for construction of the Line 1 extension to Ensanche de Vallecas. Tender budget: EUR91.3 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=025971-2004, OJ S 29, or contact Mintra, Alcorcon, fax +34 916890069. 09/04.Open call for bids, deadline 12th April, 2004 for construction of Parque Europa station on Line 10 extension to Metrosur. Tender value: EUR13.3 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=035286-2004, OJ S 40, or contact Mintra, Alcorcon, fax +34 916890069. 12/04.Open call for bids, deadline 17th August, 2004, for construction of a Line 1 extension, section Plaza de Castilla-Chamartin interchange. Tender budget: EUR100 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=117589-2004, OJ S 137, or contact Mintra, Alcorcon, fax +34 916890069. 31-32/04.Open call for bids, deadline 13th August, 2004 for construction of extension to Lines 1 and 4, section Chamartin interchange-Parque de Santa Maria. Tender budget: EUR170 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=116694-2004, OJ S 136, or contact Mintra, Alcorcon, fax +34 916890069. 31-32/04.Open call for bids, deadline 13th August, 2004 for construction of a Line 2 extension to La Elipa. Tender budget: EUR57.4 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=117593-2004, OJ S 137, or contact Mintra, Alcorcon, fax +34 916890069. 31-32/04.Open call for bids, deadline 17th August, 2004 for construction of a Line 3 extension to Villaverde, section Legazpi-San Cristobal de los Angeles. Tender budget: EUR192 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=117590-2004, OJ S 137, or contact Mintra, Alcorcon, fax +34 916890069. 31-32/04.Open call for bids, deadline 19th August, 2004 for construction of a Line 5 extension to La Alameda de Osuna. Tender budget: EUR107.4 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=117591-2004, OJ S 137, or contact Mintra, Alcorcon, fax +34 916890069. 31-32/04.Open call for bids, deadline 19th August, 2004 for construction of the new Arganzuela station on Line 6. Tender budget: EUR39 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=117587-2004, OJ S 137, or contact Mintra, Alcorcon, fax +34 916890069. 31-32/04.Open call for bids, deadline 13th August, 2004 for construction of a Line 7 extension, section 1 Las Musas-M-40. Tender budget: EUR77.7 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=116682-2004, OJ S 136, or contact Mintra, Alcorcon, fax +34 916890069. 31-32/04.Open call for bids, deadline 13th August, 2004 for construction of a Line 7 extension, section 2 M-40-Coslada. Tender budget: EUR57.6 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=116679-2004, OJ S 136, or contact Mintra, Alcorcon, fax +34 916890069. 31-32/04.Open call for bids, deadline 13th August, 2004 for construction of a Line 7 extension, section 3 Coslada-San Fernando de Henares. Tender budget: EUR181.3 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=116698-2004, OJ S 136, or contact Mintra, Alcorcon, fax +34 916890069. 31-32/04.Open call for bids, deadline 19th August, 2004 for construction of Pinar del Rey station on Line 8. Tender budget: EUR29.3 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=116696-2004, OJ S 136, or contact Mintra, Alcorcon, fax +34 916890069. 31-32/04.Open call for bids, deadline 17th August, 2004 for construction of a Line 11 extension. Tender budget: EUR76.2 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=117592-2004, OJ S 137, or contact Mintra, Alcorcon, fax +34 916890069. 31-32/04.Open call for bids, deadline 3rd September, 2004 for inspection and work control during construction of a line 1 extension, section Plaza de Castilla-Chamartin interchange. Tender budget: EUR2.2 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=124343-2004, OJ S 144, or contact Mintra, Alcorcon, fax +34 916890069. The 1,850 m Plaza de Castilla-Chamartin section includes a single station at a transport interchange. 33-34/04.Open call for bids, deadline 17th September, 2004 for quality control during construction of a line 1 extension, section Plaza de Castilla-Chamartin interchange. Tender budget: EUR725,300. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=127434-2004, OJ S 147, or contact Mintra, Alcorcon, fax +34 914880598. 33-34/04.Open call for bids, deadline 1st September, 2004 for inspection and work control during construction of an extension to Lines 1 and 4, section Chamartin interchange-Parque de Santa Maria. Tender budget: EUR2.3 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=123383-2004, OJ S 143, or contact Mintra, Alcorcon, fax +34 916890069. The 4.5 km Chamartin-Santa Maria section includes four stations. 33-34/04.Open call for bids, deadline 15th September, 2004 for quality control during construction of an extension to Lines 1 and 4, section Chamartin interchange-Parque de Santa Maria. Tender budget: EUR985,000. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=126443-2004, OJ S 146, or contact Mintra, Alcorcon, fax +34 914880598. 33-34/04.Open call for bids, deadline 1st September, 2004 for inspection and work control during construction of a line 2 extension to La Elipa. Tender budget: EUR1.8 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=123379-2004, OJ S 143, or contact Mintra, Alcorcon, fax +34 916890069. Line 2 will be extended by 1.6 km, with one station. 33-34/04.Open call for bids, deadline 15th September, 2004 for quality control during construction of a line 2 extension to La Elipa. Tender budget: EUR415,800. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=126432-2004, OJ S 146, or contact Mintra, Alcorcon, fax +34 914880598. 33-34/04.Open call for bids, deadline 3rd September,, 2004 for inspection and work control during construction of a line 3 extension to Villaverde, section Legazpi-San Cristobal de los Angeles. Tender budget: EUR2.4 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=123378-2004, OJ S 143, or contact Mintra, Alcorcon, fax +34 916890069. Line 3 will be lengthened from Legazpi to San Cristobal de los Angeles, which will add 6 km and 6 stations. 33-34/04.Open call for bids, deadline 17th September, 2004 for quality control during construction of a line 3 extension to Villaverde, section Legazpi-San Cristobal de los Angeles. Tender budget: EUR1.1 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=126439-2004, OJ S 146, or contact Mintra, Alcorcon, fax +34 914880598. 33-34/04.Open call for bids, deadline 6th September, 2004 for inspection and work control of a line 5 extension to Alameda de Osuna. Tender budget: EUR2 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=123385-2004, OJ S 143, or contact Mintra, Alcorcon, fax +34 916890069. Line 5 extension to Alameda de Osuna will span 2.4 km, with two stations. 33-34/04.Open call for bids, deadline 20th September, 2004 for quality control during construction of a line 5 extension to Alameda de Osuna. Tender budget: EUR778,000. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=127441-2004, OJ S 147, or contact Mintra, Alcorcon, fax +34 914880598. 33-34/04.Open call for bids, deadline 6th September, 2004 for inspection and work control during construction of the new Arganzuela station on Line 6. Tender budget: EUR1.9 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=123381-2004, OJ S 143, or contact Mintra, Alcorcon, fax +34 916890069. This station is on the circle line 6. 33-34/04.Open call for bids, deadline 20th September, 2004 for quality control during construction of the new Arganzuela station on Line 6. Tender budget: EUR283,000. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=126426-2004, OJ S 146, or contact Mintra, Alcorcon, fax +34 914880598. 33-34/04.Open call for bids, deadline 1st September, 2004 for inspection and work control during construction of a line 7 extension, section 1 Las Musas-M-40 and section 2 M-40-Coslada. Tender budget: EUR2.3 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=123388-2004, OJ S 143, or contact Mintra, Alcorcon, fax +34 916890069. Section Las Musas-M-40 is 1.5 km in length with one station. 33-34/04.Open call for bids, deadline 15th September, 2004 for quality control during construction of a line 7 extension, section 1 Las Musas-M-40 and section 2 M-40-Coslada. Tender budget: EUR980,300. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=126445-2004, OJ S 146, or contact Mintra, Alcorcon, fax +34 914880598. 33-34/04.Open call for bids, deadline 1st September, 2004 for inspection and work control during construction of a line 7 extension, section 3 Coslada-San Fernando de Henares. Tender budget: EUR2.4 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=124354-2004, OJ S 144, or contact Mintra, Alcorcon, fax +34 916890069. Section Coslada-San Fernando totals 4.8 km, with five stations. 33-34/04.Open call for bids, deadline 15th September, 2004 for quality control during construction of a line 7 extension, section 3 Coslada-San Fernando de Henares. Tender budget: EUR1 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=126442-2004, OJ S 146, or contact Mintra, Alcorcon, fax +34 914880598. 33-34/04.Open call for bids, deadline 6th September, 2004 for inspection and work control during construction of Pinar del Rey station on Line 8. Tender budget: EUR2 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=124350-2004, OJ S 144, or contact Mintra, Alcorcon, fax +34 916890069. This is an intermediate station on Line 8 to Barajas. 33-34/04.Open call for bids, deadline 20th September, 2004 for quality control during construction of Pinar del Rey station on Line 8. Tender budget: EUR212,200. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=127436-2004, OJ S 147, or contact Mintra, Alcorcon, fax +34 914880598. 33-34/04.Open call for bids, deadline 3rd September, 2004 for inspection and work control during construction of a line 11 extension to Carabanchel Alto. Tender budget: EUR2 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=124344-2004, OJ S 144, or contact Mintra, Alcorcon, fax +34 916890069. The extension spans 2 km with two stations. 33-34/04.Open call for bids, deadline 17th September, 2004 for quality control during construction of a line 11 extension to Carabanchel Alto. Tender budget: EUR552,200. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=es&docid=126437-2004, OJ S 146, or contact Mintra, Alcorcon, fax +34 914880598. 33-34/04.Open call for tenders, deadline 6th October, 2004 for construction of a Line 3 extension to Villaverde, section San Cristobal de los Angeles-Villaverde Alto. This is a 2.1 km section. Tender budget: EUR92.5 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=145843-2004, OJ S 169, or contact Mintra, Alcorcon, fax +34 914880098 or 914880598. 37/04.Open call for bids, deadline 22nd October, 2004 for quality management during construction of the infrastructure of Line 3, section San Cristobal de los Angeles-Villaverde Alto. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=157392-2004, OJ S 184, or contact Mintra, Alcorcon, fax +34 914880598. 40/04.Open call for bids, deadline 21st October 2004 for work inspection and monitoring during construction of the infrastructure of Line 3, section San Cristobal de los Angeles-Villaverde Alto. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=157389-2004, OJ S 184, or contact Mintra, Alcorcon, fax +34 914880598. 40/04.L. V. Salamanca Ingenieros won a EUR1.8 million contract for work inspection and monitoring during construction of Avenida de la Aviacion station on Line 10. Euroconsult won the quality management contract for the same station for EUR106,300. Visit www.lvsalamanca-ingenieros.es and www.euroconsult.es 43/04.Ferrovial Agroman will build Line 1 extension to Ensanche de Vallecas for EUR84.8 million. Visit www.ferrovial.com 43/04.Work inspection and monitoring for Line 1 extension to Ensanche de Vallecas has been awarded to a JV of Ingenieria Basica de Proyectos and Incoydesa for EUR2.3 million while Geocisa has been awarded the quality management contract for EUR720,500. Visit www.incoydesa.com and www.geocisa.com 43/04.Begar will build Parque de Europa station on Line 10 for EUR12.2 million. Visit www.begar.es 43/04.Ferrovial Agroman secured a EUR93.1 million contract for construction of a Line 1 extension, section Plaza de Castilla-Chamartin interchange. Visit www.ferrovial.com 50/04.Sacyr Vallehermoso clinched a EUR157.5 million deal for construction of extension to Lines 1 and 4, section Chamartin interchange-Parque de Santa Maria. Visit www.gruposyv.com 50/04.OHL will construct an extension to La Elipa on Line 2, for EUR54.8 million. It is a 1,619 m section for two tracks, featuring a horseshoe-shaped section. The first 400 m will be built in cut-and-cover, 7.3 m wide x 6.22 m high. Then, the Madrid tunnelling method, aka Belgian method, will be used for the next 925 m, 9.2 m wide x 7.52 m high (6.35 m high inner diameter after lining), with timber supports and concrete formwork. Then follows La Elipa station (105 m) and lastly, the final 80 m will also be built using the Madrid method. Geology consisting of coarse ground, sandy clays and clayey sands with fines content. Visit www.ohl.es 50/04.FCC secured a EUR176.7 million contract for construction of a Line 3 extension to Villaverde, section Legazpi-San Cristobal de los Angeles. The company has also been awarded a EUR87 million contract to build the next stretch, San Cristobal de los Angeles-Villaverde Alto (2.8 km). An EPB shield will be used to drive a 8.43 m-ID tunnel lined with 32 cm-thick concrete segments. Visit www.fcc.es 50/04.Ferrovial Agroman has pocketed a EUR94.4 million contract for building Line 5 extension to La Alameda de Osuna. Visit www.ferrovial.com 50/04.Comsa and Ortiz will build the new Arganzuela station on Line 6, for EUR35.1 million. Visit www.comsa.com 50/04.Sacyr Vallehermoso will build section 1 Las Musas-M-40 on the east extension to Line 7. The contract has a value of EUR70 million. This is a 1.1 km section approximately for two tracks and a cut-and-cover station. Visit www.gruposyv.com 50/04.ACS Dragados will build the following section on the extension to Line 7, section 2 M-40-Coslada, for EUR50.9 million. It is a twin bored tunnel (2 x 1,986 m, 7.38 m excavated diameter) to be driven with a Lovat TBM owned by Dragados. No station will be built for the moment but only provisions for two future stations, one of them being an interchange hub in the residential area where the 2012 Olympic village will be built if Madrid is chosen as host city. Time frame for construction: 24 months. Visit www.lovat.com and www.grupoacs.com 50/04.ACS Dragados has also secured section 3 Coslada-San Fernando de Henares on the Line 7 extension, for EUR168.4 million. It is a 3,941 m single bore tunnel, 9.38 m outer diameter, and five stations (three in Coslada and two in San Fernando). A Herrenknecht TBM owned by Dragados will be used. Visit www.herrenknecht.com and www.grupoacs.com 50/04.Constructora San Jose and Cimsa will build Pinar del Rey station on Line 8, for EUR25.8 million and a time frame of 21 months. Visit www.grupo-sanjose.com 50/04.ACS Dragados won a EUR66.6 million contract for construction of a Line 11 extension to Carabanchel Alto. It is a 1,286 m single tunnel, 9.38 m OD, to be driven by means of a NFM Technologies TBM owned by Dragados. Visit www.nfm-technologies.com and www.grupoacs.com 50/04.A EUR90,000 geotechnical investigation contract has been awarded by Mintra to Intecsa-Inarsa for core drills in the subsoil, which will study the route of a Line 11 extension from Carabanchel Alto to La Fortuna in Leganes. Technically, the route will start with a 215 m cut-and-cover tunnel in Madrid. Then, a TBM will drive a 3.1 km double-track tunnel until the Leganes district. From that point, the tunnel divides in two single-track branches: one towards the metro station in the area and the other to the rolling stock depot. Visit www.intecsa-inarsa.es 09/05.Notice of public works concession, deadline 27th March, 2006 for concession contract for the construction and operation of the Line 8 extension from Barajas to the new Madrid airport terminal T-4, inaugurated on 4th February, 2006. Extending Line 8 will require to construct a 2.5 km twin tunnel from the old to the new terminals. The underground station at the new terminal is practically built since it was planned in the project of the new terminal building at Barajas. The two tunnels have to be bored and the internal finishings of the station are pending. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=026272-2006, OJ S 24, or contact Mintra, Alcorcon, fax +34 914880598. E-mail maite.martin@mintramadrid.es 07/06.The Madrid regional government has awarded to a JV between FCC and bank Caja Madrid the 20-year concession contract to build and operate the extension to Madrid Barajas airport's terminal T-4, for an amount nearing EUR45 million. Visit www.fcc.esThe project consists in extending Line 8, which currently serves terminal T-2, from the terminus station at Barajas Pueblo. The 2.5 km-long twin bored section will predominantly be built using a TBM. FCC will use one of the two TBMs employed to excavate the Line 3 extension to Villaverde. Work starts immediately and the line will be operational at the end of the first semester of 2007. 19/06.Open call for tenders, deadline 8th February, 2007 for extension of Line 11 to La Fortuna. The 3,372 m-long section starts in PAU de Carabanchel to reach La Fortuna. The end of the line will be connected to the Cuatro Vientos rolling stock depot on Line 10, which is only 500 m distant. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=260749-2006, OJ S 243, or contact Mintra, Alcorcon, fax +34 914880598. 01-02/07.Open call for tenders, deadline 8th August, 2007 for design of the Line 2 extension to Las Rosas. Read E-News Weekly 29/2007. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=155819-2007, OJ S 127, or contact Mintra, Alcorcon, fax +34 914880598. 31/07.Open call for tenders, deadline 8th August, 2007 for design of the Line 3 extension to El Casar. Read E-News Weekly 29/2007. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=155818-2007, OJ S 127, or contact Mintra, Alcorcon, fax +34 914880598. 31/07.Open call for tenders, deadline 8th August, 2007 for design of the Line 9 extension to Mirasierra. Read E-News Weekly 29/2007. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=155808-2007, OJ S 127, or contact Mintra, Alcorcon, fax +34 914880598. 31/07.Open invitation to tender, deadline 19th May, 2008 for design of a new metro line from Chamartin to Torrejon de Ardoz (infrastructure and fit-out). The new line, 7.5 km in length, includes three stations (Avenida de la Constitucií³n, Londres and Soto del Henares) and will run below ground through the industrial parks of San Fernando de Henares and in Torrejon de Ardoz. The line will start from San Fernando de Henares near the M-45 then heading north to Torrejon de Ardoz and Soto del Henares. It then emerges to the surface near the M-50 and connects with the Madrid-Barcelona rail line and ends at Chamartin station, providing interchange with lines 1 and 10. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=100497-2008, OJ S 74, or contact Mintra, Madrid, fax +34 914880598. 17/08.Open invitation to tender, deadline 11th August, 2008 for construction of a 4.75 km extension from La Elipa to Las Rosas on Line 2, with four stations. The section will be built by TBM. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=157271-2008, OJ S 118, or contact Mintra, Madrid, fax +34 914880598. E-mail maite.martin@mintramadrid.es 26/08.A 9.4 m-diameter NFM Technologies EPB tunnel boring machine was officially launched on 10th June, 2008 by officials, as part of the 2007-2010 transport expansion programme, to bore the 3.4 km extension of Line 11 from La Peseta to La Fortuna in Leganes. The machine was last used to build a previous extension of Line 11 from Pan Bendito to La Peseta in Carabanchel. Previously, it completed the Atocha-Nuevos Ministerios section of the newly opened cross-city railway tunnel connecting Atocha and Chamartin central stations in Madrid, sections of the Metrosur Line 12 and a Line 2 extension. Click here. The construction contract has been awarded to Dragados. Of the 3,400 metres in tunnel, 25 metres to connect with La Peseta will be mined manually using Madrid's traditional method. Visit www.nfm-technologies.com and www.dragados.com 32-33/08.A consortium of FCC and Acciona has scooped a EUR134.9 million contract to extend Line 2 of the Madrid metro. The consortium will build 4.5 new kilometres of tracks to link La Elipa with the Las Rosas neighbourhood. The time frame to complete the works is 27 months. The project will add four new stations (Nicolas Salmerí³n, Alsacia, Guadalajara and Ginebra). Construction will begin before the end of the year. The builders will use a tunnel boring machine. Excavation will start from the end of the route and conclude where the line now ends and what will be the start of the future extension. The builders will take advantage of a cul de sac at La Elipa station (the last on the line at its eastern end), which was built as a reservation for future extensions during the previous eastern extension of the line. The entry shaft from where the TBM will be launched will be located next to the last of the four stations, in an area not built after crossing the M-40. Visit www.fcc.es and www.acciona.es 40/08.Open invitation to tender, deadline 19.01.2009, for cut-and-cover construction of 2.9 km extension to Line 9 from Herrera Oria to Mirasierra with two stations. Contact Maite Martin at Mintra, tel +34 91 488 0540, e-mail maite.martin@mintramadrid.es. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=310324-2008 51/08.Open invitation to tender, deadline 17.04.2009, five separate contracts for ventilation and fire-prevention installations for Line 11 Madrid metro extension to Barrio de la Fortuna as follows: value EUR1.2 million, duration 9 months, http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=065122-2009; value EUR2.6 million, duration 10 months, http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=065126-2009; value EUR2.3 million, duration 9 months, http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=065123-2009; value EUR4.6 million, duration 9 months, http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=065120-2009; value EUR2.3 million, duration 9 months, http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=065121-2009, OJ S 45. Contact MINTRA, Alcorcí³n, Mr Juan Carlos Araniguria Rodrigo, tel +34 914880-540, fax -598, e-mail contratacion@mintramadrid.es. Visit www.mintramadrid.es 11/09.