Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Spain

Spain, Basque Country - es/117

Sewage

Open invitation to tender, deadline 24th June, 2004 for design of a main sewer on the left bank of the Mundaka estuary, section Sukarrieta-Lamiaran wastewater treatment plant. This section includes a tunnel, 2 km approximately and 3 to 3.5 m in diameter. Tender budget: EUR594,200. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=088519-2004, OJ S 107, or contact Consorcio de Aguas de Busturialdea, Sukarrieta, fax +34 946171085. E-mail jbilbao.busturialde@bizkaia.org 25/04.Open call for tenders, deadline 21st July, 2005 for project design and construction of sewers and the Epele sewage treatment plant in Upper Deba. The project includes the construction of a sewer from Zubillaga to the sewage treatment plant, to convey waste waters through a 1,200 mm duct in the first 632 m and a 1,375 m-long 3.75 OD tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=098456-2005, OJ S 99, or contact Ministry of environment, Madrid, fax +34 915975912 or 915976786. E-mail fcarretero@mma.es 28/05.Open call for tenders, deadline 15th December, 2005 for work management during construction of sewers and the Epele sewage treatment plant in Upper Deba. The project includes a sewer from Zubillaga to the sewage treatment plant, part of which will run in a 1,375 m-long 3.75 m OD tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=194409-2005, OJ S 197, or contact Ministry of environment, Madrid, fax +34 915975912 or 915976786 or 915975985. E-mail mgiral@mma.es y fcarretero@mma.es 43/05.The Ministry of environment awarded the project design and construction of the Epele sewage treatment plan in Gipuzkoa province to Dragados and its affiliate Construcciones Especiales y Dragados (Drace). The contract has a value of EUR26,286,611. The project includes a 1,375 m-long 3.75 m-diameter collector sewer from Zubillaga to the plant. The Epele plant will have a capacity to treat the sewage of 107,500 residents in Upper Deba and will be a key component to eliminate the discharge to the Deba, the most polluted river in Gipuzkoa. Visit www.grupoacs.com and www.drace.com 02/06.Consorcio de Aguas de Busturialdea - the Busturialdea subregion water agency in the province of Biscay - awarded Ferrovial Agromí¡n and Excavaciones Leandro Gí³mez a EUR9.2 million contract for the construction of the section from Sukarrieta to the future Lamiaran wastewater treatment works, which forms part of the main sewer on the left bank of the Mundaka estuary. Construction management has been awarded to Euroconsult for EUR288,500. The section Sukarrieta-Lamiaran wastewater treatment plant includes the construction of a water pipe and a gravity tunnel to transport sewage. The 2,623 m-long, 4.1 m-diameter tunnel will be wide enough to allow service vehicles to do maintenance and cleaning tasks. It will be built in majority (80%) at a depth of over 30 metres, with maximum depth of 120 m and minimum depth of 14 m, using the drill/blast method, in principle with a minimum of two drives from both ends. The rock is siltstone and sandy marls. 90% of the support will consist of bolts and shotcrete reinforced with steel fibres. Where the overburden is slight, an intermediate access will be built (14 m deep shaft) to guarantee the accessibility to the tunnel and its ventilation and install the electric supply. Construction will start at the end of June approximately. In a second phase, an underground pumping station is envisaged in the Marisma park in Sukarrieta. Visit www.ferrovial.es, www.excavacionesleandrogomez.es and www.euroconsult.es 24/08.



Permalink