Works contract forecast for Lot 1 of sewerage networks in the city centre and along river Rawa. The total length of the extension and reconstruction works will be 7,015 metres. Microtunnelling will be required. Visit http://ted.eur-op.eu.int/ojs/en/frame.htm, OJ S 40, document 30484-2002. Tenders to be published in October, 2002. 10/02.