Open tendering, deadline 16th August, 2002 for detailed plans, development and construction plans for widening from two to four lanes the E6 highway, sections Alvim-Bjí¸rnstad and Bjí¸rnstad-Rí¥de totalling 10.2 km. On the latter section, there is a 900 m tunnel plus a cut-and-cover tunnel in soft soil. Contract duration from September 2002 to January 2004. Visit http://ted.eur-op.eu.int/static/home/en/homepage.ini, OJ S 116, document 90638-2002 or contact Statens Vegvesen í˜stfold, Moss, fax +47 69243501. 26/02.