Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Norway

Norway, Sogn og Fjordane - no/48

Highway

Open procedure, deadline 10th May, 2002 for the construction of a 3.5 km single tube on the E39 between Teigen and Bogen, in Hí¸yanger municipality. Profile T9, 50.45 sq m. Geology consisting of gneiss and solid rock with no major faults but high stress expected. Geological studies by NGI (Norwegian Geological Institute). Planning by Public Roads Administration. Drill/blast method. Support with rockbolts and shotcrete. Financing (50%) by toll on cars crossing the Sognefjord by ferry between Larvik and Oppedal. Visit http://ted.eur-op.eu.int/ojs/en/frame.htm, OJ S 52, document 40729-2002 or contact Public Roads Administration, Leikanger, fax +47 57655986. 12/02.Veidekke has been awarded a NOK113 million contract from the National Roads Administration to secure a new stretch of road against avalanches and landslides. There will be a 3.5 km tunnel on highway E 39 between Teigen and Bogen at Vadheim in the municipality of Hí¸yanger, and a 1 km new stretch of road. Work to start in August, with completion by the end of June 2004. Project partly financed through toll fees. Visit www.veidekke.no 28/02.Open call for tenders, deadline 31st March, 2006 for construction of the 8.4 km new E16 between Voldum and Borlaug in Laerdal municipality, including the Tuftí¥s tunnel approx. 1.9 km. This is a 8.5 m-wide single tube to be blasted in gneiss. Work start in June 2006 for completion in September 2008. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=204498-2005, OJ S 207, or contact Statens vegvesen Region west, Leikanger, fax +47 57655986. E-mail firmapost-vest@vegvesen.no 45/05.Open invitation to tender, deadline 30.01.2009, for engineering design services for E39 Torvund-Teigen road and tunnel installations which comprise 5.5 km of main road with 2.5 km in tunnel and associated works. Contract to start 06.02.2009 for completion 30.09.2009. Site works are expected between 2010 and 2013, during which phase supplementary engineering design services may be required. Information from Frode Vagstad, tel +47 5765 5824, e-mail frode.vagstad@vegvesen.no. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=315501-2008 50/08.Open invitation to tender, deadline 26.03.2009, for construction manager assistant for renovation of E16 Flenja tunnel in Aurland municipality including expansion of tunnel profile, scaling, water sealing and upgrading of lighting and ventilation systems. Assignment to commence April/May, 2009 and work in the tunnel August, 2009 for completion end-2010. Specs and docs from Eivind Yttri at Statens Vegvesen Region Vest, tel +47 8154 4010, e-mail eivind.yttri@vegvesen.no. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=044299-2009 08/09.



Permalink