Award of contract C01 to Mott MacDonald Ireland Ltd of Dublin for detailed design of 7.1 km-long stage 3 Radal-Flesland twin-track section of Bybanen light railway including six tunnels total length 2.85 km, eight tunnel portals, three railway bridges total length 260 m, seven stops, public transit terminal, depot and workshop area, and associated works. Construction start scheduled 2013. Further information from Ivar Ovretvedt at Bybanen in Bergen, tel +47 40007400. View development plan at www.bybanen-utbygging.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=016943-2012. 03/12.