Norconsult AS from Sandvika has been awarded a EUR 14.92 million (NOK150 million) E01 contract on a framework agreement for design assignments for Bybanen Utbygging.
The framework agreement, with a duration of up to 8 years, includes major engineering design services for preparatory contracts and projects for Bergen’s Light Rail, construction stage 5 and also assignments for construction of stage 4.
The fourth construction stage will run from the city centre via Haukeland Hospital and Kronstad to Mindemyren and then through Løvstakken in a tunnel towards Oasen.
The fifth construction stage runs from the city centre through Asane to Vagsbotn, together with a continual cycle route and an extension of the Fløyfjell tunnel to Eidsvåg. Contact Bybanen Utbygging, attn Christine Sletten Larsen, Bergen, email Christine.Sletten.Larsen@vlfk.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=078305-2022 and https://www.hordaland.no/. Ref. BU/21/7. 06/22.