Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Macedonia

Macedonia, National - mk/11

Railway


Prior information notice for the construction of new 24 km single-track railway section from Kriva Palanka to the border with Republic of Bulgaria, as part of Corridor VIII. The new railway section (section 3) consists of 23.4 km of single-track line with 22 tunnels (about 9 km, including the reconstruction of the border Deve Bair tunnel), 52 bridges/viaducts (about 5 km), railway station in Kriva Palanka, new station/halt in Zhidilovo. The Border tunnel at the end of Section 3 has a total length of 2,350 m.  The Macedonian reconstructed part of this tunnel will be 1,150 m long.  The remaining 1,200 m of the tunnel will be the responsibility of Bulgaria, and does not form part of this project. Value of contract EUR400 million, excluding VAT. Contact Public Enterprise for Railway Infrastructure Railways of Republic of North Macedonia - Skopje (ZRSMI), Skopje, tel +389 023227903, fax +389 02462330, email phase3@mzi.mk. Visit 

https://ted.europa.eu/en/notice/-/detail/791222-2025. Ref.n. EIB-GtP/20230032-04. 48/25.



Permalink