Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Macedonia

Macedonia, National Kumanovo - mk/11

Railway

Closing Date: 28.03.2024 (Tender Closed)


Open invitation, deadline 28/03/2024, for the detailed design and construction of a new railway section from Kriva Palanka to the border with Republic of Bulgaria, as part of Corridor VIII.  The new railway section (section 3) consists of 23.4 km of single-track line with 22 tunnels (about 9 km, including the reconstruction of the border Deve Bair tunnel), 52 bridges/viaducts (about 5 km), railway station in Kriva Palanka, new station/halt in Zhidilovo. The Border tunnel at the end of Section 3 has a total length of 2,350 m.  The Macedonian reconstructed part of this tunnel will be 1,150 m long.  The remaining 1,200 m of the tunnel will be the responsibility of Bulgaria, and does not form part of this project. Click here for bid/tender documents. Duration of the contract is 1,826 days. Contact Ministry of Finance, Central Financing and Contracting Department (CFCD), Skopje, tel +32 2 299 11 11, email cfcd@finance.gov.mk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=783588-2023. Ref.n. NEAR/SKP/2023/EA-OP/0158. 01/24. 

 




Permalink