Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Italy

Italy, Lyon-Turin - it/80

High Speed Railway

Closing Date: 25.09.2019 (Tender Closed)

Postponed from 16/09/2019 to 25/09/2019 the deadline of the negotiated invitation to tender for construction works on operational worksites n.3 (boring by TBM of the base tunnel from the Chiomonte site, direction Susa), n. 4 (boring by NATM of the base tunnel from the Chiomonte site, direction France) and n. 10 (reclamation of the earth and rocks excavated from all sites on Italian territory) under the new Lyon-Turin railway link project. The contract is composed of 2 lots: Lot 1: composed of CO3 and CO4, value EUR 802,025,000 excluding VAT; Lot 2: composed of CO10, value EUR 216,440,000 excluding VAT. Duration of the  contract is 108 months. For further information please visit  https://telt.achatpublic.com/accueil/ where offers must be sent. Contact Tunnel Euralpin Lyon Turin SAS, Le Bourget-du-Lac, tel +33 479685650, fax +33 479685683, email fonction.contrats@telt-sas.com. Click here for more information.

Ref. T13. 34/19.



Permalink