The Joint Venture Ghella SpA (leader, 47,15%), Itinera SpA (45,3%), Salcef SpA and Coget Impianti SpA secured the EUR471 million contract, excluding VAT, for the design and construction of the doubling of the Telese - San Lorenzo Maggiore (km27.700-km.39.050, Lot 2) and San Lorenzo Maggiore – Vitulano (km 39.050-km 41.950, Lot 3) sections of the Naples to Bari highspeed railway line. The sections include the following tunnels: Tuoro S.Antuono (1610 m), Cantone ( 986 m), Limata (301 m), San Lorenzo (1719 m), Ponte (466 m), Reventa (228 m) and Le Forche (2246 m). For further information on the award click here and here. Ref.n. DAC.0109.2019.24/20.