The JV Toto
Costruzioni Generali (58%) and Seli Overseas (42%) secured the EUR190 million
contract for civil works and associated works from km 19+700.00 to km 27+455.00 of the Terzo Valico
dei Giovi project on the Milan-Genoa
high-capacity, high-speed railway line, Lot Valico (Radimero).
The contract
includes the construction with 2 TBM EPB of a 7.7km bitube tunnel with a 8.66 m
inner diameter. The previewed duration is 33 months. For further information click here. Contact
COCIV (Consorzio Collegamenti Integrati Veloci), attn ing. Marcos Montevecchi,
Genova, tel +39 0104218715, email RUP@COCIV.POSTECERT.IT.
Visit http://totospa.it/ and http://www.selioverseas.com/.
and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=055984-2018.
Ref.n. F81H92000000008. 05/18.