Open call for bids, deadline 3rd June, 2004 for nine vertical and inclined core drills, 400 to 1,200 m long, and tests between the Val di Vizze in Italy and the Italian-Austrian border as part of the Brenner base tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=076894-2004, OJ S 96, or contact Brenner Basistunnel EWIV, Innsbruck, fax +43 5124030110. E-mail heimo.krassnitzer@bbt-ewiv.com 22/04.Negotiated procedure, deadline 31st January, 2005 for checking of the final design project for the Brenner base tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=205187-2004, OJ S 238, or contact Brenner Basistunnel, Innsbruck, fax +43 5124030110. E-mail heimo.krassnitzer@bbt-ewiv.com 51-52/04.The BBT JV set up by Foralith, Plankel, and Grund- Pfahl- und Sonderbau secured a EUR11.8 million contract for nine vertical and inclined core drills, at depths of 400 to 1,200 m, and tests between the Val di Vizze in Italy and the Italian-Austrian border as part of the Brenner base tunnel. Visit www.foralith.ch, www.plankel.at and www.gps-bau.com/home.htm 12/05.Open call for tenders, deadline 22nd June, 2005 for detailed geotechnical and geomechanical mapping in the zone of the Brenner base tunnel between Fortezza, Aica and Innsbruck. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=098897-2005, OJ S 99, or contact BBT SE, Innsbruck, fax +43 5124030110. E-mail heimo.krassnitzer@bbt-se.com 22/05.ILF, TAE and EUT secured a EUR2.8 million contract for the final design of the Fortezza area of the Brenner base tunnel. The contract covers the 4.2 km section from the south portal to the Aica fork; the 4.8 km Aica service tunnel; bypasses to the existing line and connections; and redevelopment of Fortezza station. Visit www.ilf.com and www.eut.bz.it 38/05.Geoprojekt secured a EUR152,250 contract for detailed geotechnical and geomechanical mapping in the zone of the Brenner base tunnel, calibration and interpretation of the data by means of data derived from samples and achievement of geological and geomechanical modelling to characterise the rock mass. The contract also includes a 3D modelling of the stress fields of the entire corridor area. 45/05.The execution of geotechnical and geomechanical tests in laboratory on rocks and soils as well as geological tests in laboratory on surface rock samples or sample pieces has been commissioned to GD Test for EUR304,000. The most important tests are the geomechanical tests carried out on sample pieces selected from about 25,000 m of samples taken from the zone of the Brenner base tunnel project between Innsbruck and Fortezza. Visit www.gdtest.it 49/05.Checking the final projects of the Brenner base tunnel has been commissioned to Rabbit Rina Arsenal Brenner Basistunnel, a joint venture between Genoa-based Rina and í–sterreichisches Forschungs- und Prüfzentrum Arsenal from Vienna. Final projects means the environmental impact statement and the technical project for the Austrian section and the final project for the Italian section. Visit www.rina.org and www.arsenal.ac.at 49/05.Open call for tenders, deadline 15th February, 2007 for construction of a 10.4 km pilot tunnel between Aica and Mules in Bolzano province, south Tyrol, a 1.8 km access adit in Mules, a 400 m connecting tunnel between Aica / Unterplattner and Riga valley and processing and management of the excavated material. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=255287-2006, OJ S 239, or contact Galleria di Base del Brennero, Innsbruck, fax +43 5124030110. E-mail ava@bbt-se.com 51-52/06.Open call for tenders, deadline 2nd May, 2007 for on-site supervision and work management during construction of the 10.4 km pilot bore from Naz-Sciaves to chainage 10+400 in Bolzano province, the 1.8 km Mules access adit, a 400 m connecting tunnel between Aica and Riga valley, and preparation and management of excavated materials. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=69178-2007, OJ S 56, or contact Galleria di base del Brennero / Brenner basistunnel BBT, Innsbruck, fax +43 5124030110. E-mail ava@bbt-se.com 13/07.Open call for tenders, deadline 16th May, 2007 for environmental monitoring for the 10.4 km Aica-Mules pilot tunnel and its access adits in Bolzano province. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=90382-2007, OJ S 74, or contact Galleria di Base del Brennero / Brenner Basistunnel BBT, Innsbruck, fax +43 512 4030110. E-mail ava@bbt-se.com 17/07.Consortium ATB headed by Pizzarotti signed a EUR78.9 million contract to build a 10.4 km pilot tunnel between Aica and Mules in Bolzano province, south Tyrol, a 1.8 km access adit in Mules, a 400 m connecting tunnel between Aica / Unterplattner and Riga valley and processing and management of the excavated material, as part of the Brenner base tunnel project. Click here. Visit www.pizzarotti.it and www.bbt-ewiv.com 30/07.Consortium ATB, whose members are Pizzarotti, Condotte, SELI, Collini, Bilfinger Berger, Alpine Mayreder, Jaeger Bau and Beton- und Monierbau, has been awarded the contract to build the Aica-Mules access adit to the Brenner base tunnel and commissioned its construction to SELI using a TBM. SELI will supply the TBM and ancillary equipment, bore the tunnel and install the support. The excavated diameter is 6.3 m (31 sq m) and the finished inner diameter is 5.6 m. The main underground structure is the Mules access adit, 35 sq m in cross-section, 10% gradient and length of 1,800 m. This first lot will mainly cross the Bressanone granite, a hard rock formation generally of good quality. The high cover and the presence of faults and fractured zones could make tunnelling critical at certain spots. The consortium already owns the TBM (a Wirth machine previously used for the San Francisco project in Ecuador by Odebrecht) and is modifying its diameter and revising it in its facilities. Click ec/18 and here. The supply includes the a double shield rock TBM with back-up and conveyor belt for rock haulage. It is planned to install both precast concrete segments and traditional supports (bolts, wire mesh, steel arches and shotcrete). The rock haulage will be performed by means of a new conveyor belt supplied by Marti Technik. Tunnelling is programmed to commence in April 2008. Visit www.pizzarotti.it, www.condotte.it, www.impresacollini.it, www.selitunnel.com, www.bilfingerberger.de, www.alpine-bau.de, www.jaegerbau.com, www.bemo.net, www.wirth-europe.com and www.martitechnik.ch 46/07.Concer & Partners signed a EUR2.4 million deal for on-site supervision and work management during construction of the 10.4 km pilot bore from Naz-Sciaves to chainage 10+400 in Bolzano province, the 1.8 km Mules access adit, a 400 m connecting tunnel between Aica and Riga valley, and preparation and management of excavated materials. Visit www.concerepartners.it 50-51/07.The joint venture Wasserwirtschaftliche Beweissicherung Brenner Basistunnel and ILF Beratende Ingenieure ZT GmbH has secured the contract for monitoring water Phase IIA of the Brenner Base Tunnel. Contract value EUR1,675,865, duration 31 months. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=082648-2009, OJ S 58 and www.ilf.com. For more contact BBT SE, Dr. Kathrin Eberle in Innsbruck, tel +43 5124030, fax +43 5124030-110, e-mail ava@bbt-se.com. 15/09. Invitation to tender, deadline 10.09.2009, for the measurement of emissions before and during the construction exploration tunnels Innsbruck-Steinach-Ahrental and Wolf. Time limit 03.09.2009 for receipt of requests for documents or for accessing documents. Contract duration 60 days. Contact Dott. Johann Hager, Brenner Basistunnel BBT SE, Innsbruck, tel +43 5124030, fax -110, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=200483-2009. 31/09.Invitation to tender, deadline 08.09.2009, for noise measurement, traffic surveys and site inspections before, during and after the construction of exploration tunnels Innsbruck-Steinach-Ahrental and Wolf. Time limit 01.09.2009 for receipt of requests for documents or for accessing documents. Contract duration 60 days. Contact Dott. Johann Hager, Brenner Basistunnel BBT SE, Innsbruck, tel +43 5124030, fax -110, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=200484 -2009. 31/09.Invitation to tender, deadline 09.09.2009, for detection and monitoring of vibration and secondary airborne noise before and during construction of the Innsbruck-Ahrental and Steinach-Wolf sections. Time limit 02.09.2009 for receipt of requests for documents or for accessing documents. Contract duration 60 days. Contact Dott. Johann Hager, Brenner Basistunnel BBT SE, Innsbruck, tel +43 5124030, fax -110, e-mail ava@bbt-se.com. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=200485-2009 31/09.Invitation to tender, deadline 11.09.2009, to perform buildings certification and measurements of geodetic control (with technical assistance from a geologist) before, during and after construction work in Innsbruck-Ahrental and Steinach-Wolf sections. Time limit 04.09.2009 for receipt of requests for documents or for accessing documents. Contract duration 60 days. Contact Dott. Johann Hager, Brenner Basistunnel BBT SE, Innsbruck, tel +43 5124030, fax -110, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=200486-2009. 31/09.First postponement of open invitation to tender for the management and geological documentation of Innsbruck-Ahrental running tunnel, part of Brenner base tunnel. Deadline now 25.08.2009. Time limit 18.08.2009 for receipt of requests for documents or for accessing documents. Contact Dr Johann Hager at BBT SE in Innsbruck, tel +43 512403-0, fax -0110, e-mail ava@bbt-se.com to whom tenders or requests to participate should be sent. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=217303-2009. 33/09.The JV Plankel/GPS/Tiefbohr of Gewerbepark 70, A-9710 Pöllan secured the contract n. B0041, value EUR1.1 million, for 23 short exploratory boreholes at the Austrian Brenner Base Tunnel section, Lot 1. Visit www.plankel.at, www.gps-bau.com and www.tiefbohr-robier.at. Geotec SpA.of Via G. Barbato 20, I-86100 Campobasso secured the contract n. B0051, value EUR1.1 million, for 22 short exploratory boreholes at the Italian Brenner Base Tunnel section, Lot 2. Visit www.geotecspa.com.For more information contact Dr Johann Hager, Galleria di Base del Brennero Brenner Basistunnel BBT SE, Innsbruck, tel +43 512403-0, fax -0110, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=295478-2009. 44/09.NUA Umweltanalytik GMBH, Südstadtzentrum 4, A-2344 Maria Enzersdorf secured the EUR730,000 contract for the measurement of emissions before and during the construction of exploration tunnels Innsbruck-Ahrental and Steinach-Wolf. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=335983-2009 and www.nua.co.at.JV Bernard/Gebauer/Intergeo, Bahnhofstrasse 19, A-6060 Hall in Tirol secured the EUR2,435,682 million contract for the management and geological documentation of Innsbruck-Ahrental running tunnel, part of Brenner base tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=335984-2009.IC Consulenten Ziviltechniker GesmbH, Schönbrunner Strasse 297, A-1020 Vienna, secured the EUR241,588 contract for detection and monitoring of vibration and secondary airborne noise before and during construction of the Innsbruck-Ahrental and Steinach-Wolf sections. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=336038-2009 and www.ic-group.org.JV Bernard/Speckbacher/Trigonos, Bahnhofstrasse 19, A-6060 Hall in Tirol secured the EUR606,597 contract to perform buildings certification and measurements of geodetic control (with technical assistance from a geologist) before, during and after construction work in Innsbruck-Ahrental and Steinach-Wolf sections. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=341874-2009.Contact for the above Brenner awards is Dr Johann Hager at BBT SE in Innsbruck, tel +43 512403-0, fax -0110, e-mail ava@bbt-se.com. 51/09.Award of contract, value EUR63,227,727 excluding VAT, for establishment of Ahrental access tunnel (2.42 km); Ahrental exploration adit (2.515 km); and continuous miner tunnels Innsbruck (2.815 km) and Sillschlucht (290 m) and associated works, to Arbeitsgemeinschaft Erkundungsstollen Brenner Nord of 1100 Wien. More from Dr Johann Hager at BBT SE in Innsbruck, tel +43 5124030, fax +43 5124030-110, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=020235-2010. 04/10.AVD-AI JV of Dornbirn, Austria secured the EUR960,699 contract for geotechnical distortion measurements and geodetic control of Innsbruck-Ahrental running tunnel, part of Brenner base tunnel. Contact Dr Johann Hager at BBT SE in Innsbruck, tel +43 512403-0, fax -0110, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=022676-2010. 06/10.Vicenzetto Srl of Villa Estense have secured the EUR587,987 contract for test drilling and boring work in Brenner Base tunnel. Contact Johann Hager at BBT SE in Innsbruck, tel +43 5124030, fax +43 5124030-110, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=062301-2010 and www.vicenzetto.it. 10/10.