Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Italy

Italy, Brenner - it/103

High Speed Railway


Geotec SpA from Campobasso secured the EUR1.88 million contract, excluding VAT, to measure (KTM) for distortion and to do laser scanner reliefs (TSC) to enable the correct construction of the cross sections of underground works in the Brenner Base tunnel, the lot is the Isarco underground crossing. Contact Galleria di Base del Brennero, att.n Arturo Piero Mazzucato, Bolzano, tel +39 047106-22/10, fax +39 047106-22/11, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=4455-2016. Ref.n. AP223. 02/16.




Permalink