Postponed from 09/08/2018 to 29/08/2018 the deadline for the
Invitation for bids for Design, Manufacture, Supply, Installation, Testing and
Commissioning of a Tunnel Ventilation System & Environmental Control System
between Aarey (including) to BKC (including) Stations for Mumbai Metro Line 3
(Package 15). Contact Mumbai Metro Rail Corporation (MMRC), Mumbai, attn
General Manager (RS & Elect.), tel +91-22-26597659, fax
+91-22-26590150, email rajeev@mmrcl.com.
Visit
https://www.mmrcl.com/sites/default/files/Addendum-5%20with%20sign.pdf
and https://www.mmrcl.com/sites/default/files/Addendum-6%20published.pdf.
Ref.n. MM3-CBS-TVE. 33/18.