Postponed from 24/07/2018 to 09/08/2018 the deadline for the Invitation for bids for Design, Manufacture, Supply, Installation, Testing and Commissioning of Tunnel Ventilation System & Environmental Control System between Aarey (including) to BKC (including) Stations for Mumbai Metro Line 3 (Package 15). Contact Mumbai Metro Rail Corporation (MMRC), Mumbai, attn General Manager (RS & Elect.), tel +91-22-26597659, fax +91-22-26590150, email rajeev@mmrcl.com. Visit
https://www.mmrcl.com/sites/default/files/TVE%20Phase-1%20Addendum%20No%204.pdf.
Ref.n.MM3-CBS-TVE. 29/18.