Postponed from 10/07/2018 to 24/07/2018 the deadline for the
Invitation for Bids for Design, Manufacture, Supply, Installation, Testing and
Commissioning of Tunnel Ventilation System & Environmental Control System
between Aarey (including) to BKC (including) Stations for Mumbai Metro Line 3
(Package 15). Contact Mumbai Metro Rail Corporation (MMRC), Mumbai, attn General
Manager (RS & Elect.), tel +91-22-26597659, fax
+91-22-26590150, email rajeev@mmrcl.com.
Visit
https://www.mmrcl.com/sites/default/files/TVE%20Phase-1%20Addendum%20No%202.pdf
and https://www.mmrcl.com/sites/default/files/combinepdf.pdf.
Ref.n.
MM3-CBS-TVE.28/18.