India
India,
Madhya Pradesh
- in/105
Metro
Closing Date:
13.05.2024 (Tender Closed)
Open invitation to tender, deadline 13/05/2024, for the design & construction of twin tunnel (Up & Down by Shield TBM), Cut& Cover, Cross-passages with/without sump, Ramps, 7 Underground Stations (Indore Railway station, Rajwada, Chota Ganpati ,Bada Ganpati, Ramchandra Nagar, BSF/Kalani Nagar and Airport) including Architectural finishing, Plumbing works in the entire underground section from km 5+862 to km14+482.347-14+488 for the Indore Metro Rail Project, Package IN-05R. This is the only underground package of the 33.53 km Indore Metro Phase 1 project. The Pre Bid Meeting Place will be held on 12-Apr-2024 11:00 AM. Contact Madhya Pradesh Metro Rail Corporation Limited (MPMRCL), Berkheda City Bhopal, Madhya Pradesh. Visit https://etenders.gov.in/eprocure/app. Tender Ref. n. 569/MPMRCL/2024/IN05R, Tender ID. 2024_MPMRA_190668_1. 12/24..