Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Greece

Greece, Thessaly - gr/28

Road

Open call for tenders, deadline 17th March, 2004 for construction of the 1,470 m single-tube Gropa tunnel, 10 m in nominal diameter. Cost: EUR27 million. NATM to be used with drill/blast if necessary. Support with forepiling, steel arches and bolts. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=011505-2004, OJ S 14, or contact Ypechode, Athens, fax +30 2106450782. E-mail ggdeosye@otenet.gr 05/04.Open call for tenders, deadline 31st March, 2004 for construction of the 1,470 m single-tube Gropa tunnel, 10 m in nominal diameter. Cost: EUR27 million. NATM to be used with drill/blast if necessary. Support with forepiling, steel arches and bolts. This tender cancels and replaces the one published in January. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=022663-2004, OJ S 26, or contact Ypechode, Athens, fax +30 2106450782. E-mail ggdeosye@otenet.gr 08/04.Open call for tenders, deadline 10th March, 2005 for construction of the 1,470 m single-tube Gropa tunnel, 10 m in nominal diameter. Cost: EUR27 million. NATM to be used with drill/blast if necessary. Support with forepiling, steel arches and bolts. This is a rebid. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=012973-2005, OJ S 14, or contact Ypechode, Athens, fax +30 2106450782. E-mail ggdeosye@otenet.gr 04/05.J&P Avax's subsidiary Eteth was awarded a EUR14 million contract for the construction of the Gropa road tunnel on the Pyli-Stournareika-Mesohora secondary national road in Trikala prefecture, central Greece. The project includes a 1,470 m tunnel. The new route will divert traffic away from the Gropa mountain pass which produces several landslides and frequent traffic halts due to snowfall during the winter. The contract includes also the E&M equipment. The project is due for completion in 42 months. Visit www.jp-avax.gr 40/05.



Permalink