Dywidag, now part of Walter Bau, has won a €13 million contract to build the Schwarzer Berg tunnel, on the Scheinfurt-Bamberg section of motorway A70. Length 722 m, cross section 102 sq m, NATM mainly with excavator. Start in September 2002 for completion in April 2004. Visit www.walter-bau.de 37/02.Open invitation to tender, deadline 18th December, 2003 for electrotechnical equipment of the Schwarzer Berg tunnel, second tube, length 738 m, headroom of 6.55 m, and equipment renovation in the first tube, length 722 m. This tunnel is on motorway A70, from Schweinfurt to Bamberg, section Knetzgau-Eitmann. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=190900-2003, OJ S 212, or contact Autobahndirektiobn Nordbayern, Nuremberg, fax +49 9114621456. 46/03.OSMO Anlagenbau has secured a EUR3.2 million contract for the electrotechnical equipment of the second bore of the Schwarzer Berg tunnel (738 m) and renovation of the first tube (722 m). Visit www.osmo-anlagenbau.com 29/04.