Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Germany

Germany, Munich - de/179

Railway

CONTRACT MODIFICATION - 2nd Munich S‑Bahn Main Line – VE 30 Tunnel West, Trough Structure and Hp Hauptbahnhof Bahnhofplatz

Ref: 59857‑2026  OJ S 18/2026  Published 27/01/2026

Contract Modification Notice – Works

Buyer

DB InfraGO AG - Email: Hector.H.Redondo@deutschebahn.com

Project Description

The contract concerns VE 30 structural works for the western tunnel section of the 2nd Munich S‑Bahn Main Line, including:

Construction of two single‑track running tunnels between the western portal near Donnersbergerbrücke and the Marienhof station area (exclusive).

In the mined tunnel section: construction of four emergency shafts with connecting rescue adits to the main tunnels.

Construction (shell works) of a new underground S‑Bahn station at Hauptbahnhof Bahnhofplatz, featuring:

  • Two tracks
  • Separate boarding and alighting platforms (Spanish solution)
  • Access structures (central entrance, Schützenstraße entrance, Bayerstraße emergency exit)

Intermediate levels, technical rooms, and connections to existing U‑Bahn structures.

Location: Munich (DE212), Germany

Internal ID: 14TEI10205

Legal basis: Directive 2014/25/EU (Utilities)

Contract Award (Original Contract)

Winner: Arge 2. S‑Bahn Stammstrecke München Tunnel Hauptbahnhof

Tender ID: 14TEI10205

Contract signed: 30/11/2018

Tender value recorded in this notice: EUR 5,000.00

(Subcontracting: No)

Total value of all contracts in this notice:

EUR 676,582,091.35

 Reason for Modification

The contracting authority identified unforeseen site conditions during preparatory specialist foundation works for the western extension. An unknown groundwater monitoring well was encountered.

Nature of the Change

The groundwater measuring point must be dismantled and removed to ensure:

Protection of the filtered aquifer

Continuation of construction activities

Compliance with water‑management regulations

The modification does not alter the overall construction task, but is required to maintain environmental protection and project continuity.

Previous contract award notice referenced: 158087‑2019

Modified contract ID: CON‑0000

Review Body

Vergabekammer des Bundes beim Bundeskartellamt

Kaiser‑Friedrich‑Straße 16, 53123 Bonn

Email: vk@bundeskartellamt.bund.de

 

Organisations

DB InfraGO AG – Buyer

Frankfurt am Main, Germany

Email: Hector.H.Redondo@deutschebahn.com

Arge 2. S‑Bahn Stammstrecke München Tunnel Hauptbahnhof – Contractor

Munich, Germany

Email: info@wf-ib.de

For further information please visit https://ted.europa.eu/en/notice/-/detail/59857-2026 06/26.



Permalink