The Joint Venture TECNICA Y PROYECTOS SA composed of TYPSA (65%) and INGEROP T3 SLU (35%) secured the EUR 2.29 million contract, excluding VAT, for the design of the refurbishment of the Somport railway tunnel, 7875 m long with 4012 m in France and 3863 in Spain, on the Pau - Canfranc railway line. Contact Adif, Madrid, tel +34 610531507, email comprascontratacion@adif.es. Visit https://contrataciondelestado.es/ and https://www.adif.es/. Ref.n. 24/27507.0364. 30/25.