Alstom transport SA from Saint-Ouen secured the EUR713.56 million contract, excluding VAT, for the design, construction and maintenance of the metro Line 3 in Toulouse. The new line will be 27 km long, mainly underground, with 21 stations. The duration of the contract is 288 months. For further on the tender click here. Contact SMAT, Tolosa, email correspondre@aws-france.fr. Ref.n. M3 2018 13662 M. 50/20.