The contract for the construction of a tunnel (3293 m) and the Bakovac-Lika canal, transferring the waters of the Bakovac stream into the Lika river as part of the Kosinj-Senj hydropower system project was not awarded. Contact Hrvatska elektroprivreda d.d., Zagabria, tel +385 16322613, email info_nabava@hep.hr. For further on the TED tender, please click here. Ref.n. DD-V-3/20-D2. 27/21.