Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Colombia

Colombia, Valle del Cauca - co/21

Road

Closing Date: 04.04.2014 (Tender Closed)

ANI (Agencia Nacional de Infraestructura) published the tender, deadline 04.04.2014, for the ten prequalified groups for design, funding, construction, refurbishment, maintenance of the 31.8 km-long road connecting Mulalo and Loboguerrero in Valle del Cauca, including 12 km with nine tunnels and the updating of the  52 km Cali-Dagua-Loboguerrero section. Value project 1.47 billion Pesos.

The ten groups prequalified last June are Consortium Strabag/Concay (Austria and Colombia);  ATI Tradeco/Cedicor (Mexico and Uruguay); Concessionaria 4G Eurolat del Valle (Colombia and Spain); Constructora Andrade Gutierrez SA/Pavimentos Colombia SA/Sainc Ingenieros Constructores SA (Brasil e Colombia); Concessionaria Vial del Pacífico (Colombia and Spain); OHL Concesiones (Spain); Conconcreto/Vinci del Pacífico (France and Colombia); Impregilo SpA/Salini SpA (Italy); Odebrecht (Brasil); SAC VT (Colombia and Spain). For further information visit http://www.ani.gov.co/article/ani-comienza-proceso-de-licitacion-de-proyecto-mulalo-loboguerrero-7514 and https://www.contratos.gov.co/consultas/detalleProceso.do?numConstancia=13-19-1442332. Bid n. VJ-VE-IP-LP-002-2013. 49/13.



Permalink