Requests for Qualification (RFQ), deadline 18/08/2020, for the DBF (Design-Build-Finance) contract for the southern portion of the Ontario Line, from Exhibition/Ontario Place to the Don Yard portal (west of the Don River). The contract will include Civil: ground works required to build the tunnels and stations; utility and conduit works to prepare for the RSSOM mechanical and electrical systems; guideway structures and facilities to prepare for the track structure to be installed by the RSSOM contractor Stations: 1 above-ground station to be integrated with the existing GO Transit Exhibition Station, 2 underground stations to be integrated with the existing TTC Osgoode and Queen subway stations and 4 new underground stations (King/Bathurst, Queen/Spadina, Moss Park, Corktown); Tunnel: a 6 km tunnel and all associated tunnelling works from Exhibition to Don Yard portal (west of Don River).
The pre-bidding webinar will be on 16/06/2020 at 10:00:00 AM EDT. Contact Infrastructure Ontario , attn Monica Silaghi, tel 416-326-6845, email monica.silaghi@infrastructureontario.ca. For tender information please click here. Ref.n. 0000176859. 23/20.