Infrastructure Ontario (IO) and Metrolinx have awarded a fixed-price contract of EUR 512.90 million (CAD757.1 million) to Strabag to design, build and finance the tunnels for the Scarborough Subway Extension project. The Strabag team includes Strabag Inc (Construction Team), Arup Canada Inc and Brian Isherwood & Associates Ltd (Design Team) and Strabag Inc (Financial Advisor). Construction is expected to begin in spring 2021, with major tunnel boring works to start in spring/summer of 2022.
The Scarborough Subway Extension Advance Tunnel scope of work includes tunnelling works for the 7.8-km subway extension, from Kennedy Station to McCowan Road/Sheppard Avenue; design and construction of launch and extraction shafts, tunnel, as well as headwalls for emergency exit buildings and stations; supplying the TBM and installing segmental precast concrete tunnel liners; activities necessary to build the tunnel (e.g. utility relocations, supports for shaft and headwalls, temporary power supply, lighting, ventilation, and drainage). Visit https://www.infrastructureontario.ca/ . 21/21.